ML19329A209

From kanterella
Jump to navigation Jump to search
Forwards Outline of Guidance for Info Needed for Seismic Qualification Rept from Util
ML19329A209
Person / Time
Site: Oconee  
Issue date: 08/10/1976
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Goller K
Office of Nuclear Reactor Regulation
References
NUDOCS 7912300247
Download: ML19329A209 (2)


Text

-.

r

~'

J..

  1. gg 10 %76~

K. R. Goller, Assistant Director for Operating Reactors Division of Operating Reactors Plant Name: j0 onqe Units 1, 2, & 3 Docket Nos: QO-26f/270/289

Subject:

Inforr# tion for seismic qualification of Oconce Emergency Power System TAR Ho: ~ ORB-1-250 Responsible Branch: ORS 1 Project Manager:

G. Zech Requested Completion Date: August 13, 1976 Licensee Response !!eeded to Meet Schedule: 9/10/76 Reviert Status: Outline of Guidance for Information Needed i

The enclosure contains the outline of the infont.ation needed for the seismic qualification report to be submitted by the licensec.

(

.Our guidance for this information covers the structural and nachanical 1

engineering aspects of seismic design. Ilowever, if this system is not protected against tornado missiles, the licensee should provide sufficient j

justification ~for excluding tcrnado protection. Any additional infor:aation

]

regarding the need for tornado protection of the Emergency Power System j

should be reviewed by the EEB.

. bat m...

a D. G. Eisenhut, Assistant Director 1

for Operational Tecnnology j

Division of Operating Reactors a-

l

Enclosure:

DISTRIBUTION: g As stated Central Files NRR-Rdg cc:

V. Stello EB-Rdg

.l. Reece

.L. Shao W. Butler

,B. Grimes-nA-A W

/>,

t %r+

m N:YB:5R BC: ?

D0R o,, c.d

.[0.}agchi

.EB:D0Jt so.~m

  • GBagchi :de..._

RStuart

_ L. ao DE_ _ _

.i.m.

_,_8/10/7_6 8/// /76__._

8///f76_._ _8/j76 ve

  • Foran MC.318 (Rev. 9 53) MCM 0240 W u. s. novanmusar ensurine o, pics: iere.sne.se.

-7912300 297 jo m

(

(~

OC0 flee STATION UllITS 1, 2, & 3 SEISMIC QUAL.IFICATION OF EMERGENCY POUER P GUIDANCE FOR INFORMATION NEEDED ENGINEERING BRANCH I

DIVISION OF OPERATING REACTORS Provide a description of the seismic Category 1 System, inclu i

Indicate clearly the extent and the 1.

ith physical boundaries of the Category I System, and interfaces sketches as appropriate.

Hon-Category I System.

Provide information pertaining to applicable codes, standa specifications, regulations, general design criteria, regulator 2.

guides, and industry standards that were applied in the des fabrication and installation of the system.

This can be Provide information regarding skismic input. accomp 3.

plant FSAP..

Provide. information pertaining to applicable loads and various 4.

combinations thereof.

Information should The' design and analysis methods will be reviewed.

be provided regarding the details of the ma 5.

A discussion should be included to indicate h the mathematical model, and the consequences of a failure of non-Category I Systems on Category I Systems.

The design limits imposed on various param 6.

should be indicated.

The materials, quality control procedures, and any spec 7.

techniques should be described.

Describe any testing and inservice surveillance requirem 8.

. system.

Discuss the extent to which this system is protected again 9.

flood, and tornado effects.

For each of the items indicated above, the review proce acceptance criteria are described in the Section 3.8.4 of th NOTE:

Standard Review Plan.

3, 4

-V x

.Q_.

.