ML19329A187

From kanterella
Jump to navigation Jump to search
Notifies of Schedule for Util Task Force Review of Turbine Bldg Flooding.Review to Be Complete by May 1977
ML19329A187
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/17/1976
From: Buckley B
Office of Nuclear Reactor Regulation
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 7912300215
Download: ML19329A187 (1)


Text

LA h &

Y-0 bo DEC 171976 l

j.

HEMORANDUH FOR:

D. G. Eisenhut Assistant Director for Operational Technology, Division of Operating Reactors I

FROM:

B. Buckley, Section Leader, Plant Systens Branch Division of Operating Reactors THRU:

W. R. Butler, Chief, Plant Systems Branch, Division of Operating Reactors

SUBJECT:

FLOODIfiG OF OCO';EE TURBIliE DUILDING Duke Power Company has a special task force assigned to review this occurrence. They are performing a comprehensive review to determine what long term design modifications are needed to preclude a repeat occurrence regardless of a pipe break location.

The current schedule l

calls for Duke Power to complete and submit its proposed modification in the February-March 1977 time frame.

PSB intturn will complete its j

review in May 1977. We have requested that Duke Power periodically advise us of their progress and subnit preliminary information in regard to the design approaches they intend to take. This will afford us '.ne opportunity to make timely comments on their inte.1ded course of ac.:ior,

p qn om m

..k ru ds J o o Ju o Juu B. Buckley, Section Leader i

Plant Systems Branch Division of Operating Reactors DISTRIBUTIONS:

l l

Central Files PSB Files BBuckley Reading i

BBuckley PAtherton I

FClemenson CO~A(, y

'N %.

DOR.: L/ SB_._30RICIESBq

.c =

  • BBuckN.~t'g_. WRBytle..h)

{

-,2dbiis-.-l2abiis-

... ~

~ '

para ABC.31s (Rev. p.53) AICM 0240 W u. s. oovrassesass, pasuviese orrects to?4.ose.see 1

7912800 2/ 6 g

\\

\\