I JUN 0 7 976 N-William P. Camill, AssDtant Director for Site Technology, DSE TERU:
J. C. Stepp, Chief, Geology and Seismology Branch, DSE SEISMIC EVENTS NEAR OCONEg PLANT Please reference Jackson /Stepp Pobruary 11. and January 15, 1976 memorandum and h1 man January 30, 1976 memorandum, attached.
1 As a result of a recent passing conversation with the project manager for Oconee I have only a small amount of new information relating to the seismicity near the Jocassee Dam. In effect, 1
there have been no events since early March. This fact could lead to the conclusion that all stress is relieved and nothing further is expected or that a larger event is building. Since I p
am not a seismologist and since I have no data other than heresay, I certainly emanat make a judgment.
I do know, however, that the Jocassee Den is designed for a.053 l
vertical and.lg horisontal accelerations and, if I interpret the Hulman memo correctly, its failure could flood Oconee. A magnitude 3.2 has already occurred along with a large musber of smaller quakes. A magnitude 4 to 4.5 could generate such an acceleration; We have ao factual data-or formal reports on these events and' thus this again is only heresay.
i The main purpose of this memo and what distresses me is the lack of official concern for this situation. There appears to be far more scientific reasons to investigate this area than there was to require monitoring at Brunswick albeit, there is no intervention i
yet at Oconee. It is also distressing that most of the geologic and meismologic community as well as the public in the southeast is aware of the factual aspects relating to this activity. In fact, as far as I can see, we, as an organization responsible for the safety of these plants, are the least knowledgeable of what is i
going on.
i Fortunately, as I am told, the applicant has approached this situation' l
in'a responsible==naar;end has installed a temporary monitoring net-work.
The applicant, as I understand it, has a great deal of,.
information with which they would provide to the staff. In light of the apparently low "3" value for these units, the limited knowledge of the geology of the site area, and the extensive awareness of the NRC's lack of concern, I believe that s' seismologist should be i
assigned to review the entire situation. I realise that I am not manww -
. ~ + * = ~ ~ ~
---~ ~ ~==='"E=Y L"'"^
~^ ' ~ '
p_,_.-
$912300/70
s' r
William P. Camill 2
a seismologist, but this is an obvious situation which any geoscientist would merit worthy of concerne I also believe that Branch and NRC credibility is of concern here. This is the emnet situation where I believe that we should take the lead.
Robert E. Jackson, Geologist Geology and Seismology Branch Division of Site Safety and Environmental Analysis Attachments As stated een w/ attachment H. L'enton C. Zech
- 1. Jackson L. Hulman Distribution:
Central File NRR Rdg GSB RDg DSE Rdg
-4
~
j DS DSE GSB DSE:GS orric,
. _ tab HL e:
t 6/1/
6/J_/76
[5/76 o...
l~
I For.s ABC 318 (Rev. 9 53) ABOE 9240 e W u. a. oovannneswr resurine orrics: e.pa.sae.see u.
a>
~..
3%
o mem H
v.o d is-my,4[&
y T
UNITED STATES C$
oeg
>, e,
/9 NUCLEAR REGULATORY COMMISSION 6 f, y //j
(/p W AS'ilNGToN, D. C. 20555 FEB 11 1976
- /do, W,b,
.n,;.,,.. 3 a n.C.,, f.' /...
William P. Gammill, Assistant Director for Site Technology, SSEA l'#y J. C. Stepp, Chief, Geology and Seismology Branch, SSEA THRU:
SEISMIC EVENTS NEAR OCONEE PLANT 15, 1976 memorandum for background. As Please reference January per your request I called Dr. Pradeep Talwani on February 4, 1975 to discuss any new information that he may have acquired since the conversation I had with him on January 14, 1976.
He indicated that two events had been recorded since that time.
l
. On January 13, 1976 a felt earthquake of magnitude 2.5 was recorded.
. On January 16, 1976 an earthquake of magnitude 2.1 was recorded. He stated that this was probably an aftershock of the January 13th event.
Dr. Taiwani indicated that the epicenters grouped into three clustere, l
one south of the lake, one in the lake, and one north of the lake, and that the trend of this alignment would orient N10-15*E to NE-SW.
He also stated that such a trend passes slightly to the west of the dam.
He also indicated that he had several strong motion instruments installed He has not analyzed on the dam and they tripped during the last events.
' the data from these instruments as yet.
He also described the purposes of his study as being research in the area of earthquake prediction. He stated that he believes they predicted one of the January events.
Dr. Talwani mentioned that he had discussed the geology of the Lake Jocassee area with Dr. Hatcher of Clemson University and that Dr. Hatcher had stated that he does not know of any faults in that specific area.
WTro l
i
),
l nm w..#
I J.
i i
YED 1 1 nyg 2
William P. Cammill 2, 3 On February 5, 1976, Gary Zech, Project Manage ff specify these seismic events although they request that the sta those items that they would like to have addre sed.
N 4
a R. E. Jac o, Geologist Geology a d eismology Branch Division d Site Safety j
and Environmental Analysis
\\
Attachment:
January 15, 1976 memorandum ec:
R. Denton G. Zech R. Jackson
(
L. Hulman
]
W-L'.? ?
h A, l
Pg h'
WUCLEAH HEGULATORY COMMISSION '
, g h;,e )
!JM
"^5"'*""-
- c.... c o <, 6
- pgb
,,, u,
a1 m
William P. Ccmmill, Assistant Director for Site. Technology TilRU:
J.C.Stepp, Chief,Geologyand.SeismologyBranchp"
'SEISHIC EVENT NEAR OCONEE PLANTS s
on January 14,.1976 I had a telecon with Dr. Pradeep Talvani, a seismologist at the University of South Carolina.
In the conver-sation he indicated that he was involved in monitoring some earth-quakes in the vicinity of Lake Jocassee, South Carolina, approxi-
.g mately 15 miles north of Oconee 1, 2, 3 nuclear plant. The chronology of his involvement is as follows:
l Lake Jocassee began filling in 1973 and reached full head in March 1975. At that time an earthquake was felt by one
~ individual near the dam.
,On October 1,1975 a magnitude 3 earthquake was felt at the i
dem and Dr. Talvani states, "it shook up the people in the
-powerhouse." Two days after this event several small after-shocks were picked up with instruments.
Other events were noted on November 6 and 7 and monitoring was, undertaken for 10 days afterwards, a large number of aftershocks were recorded.
. On November 9, Law Engineering, consultants to Duke Power, set up instruments borrowed from Dr. Long and about this same time Dr. Talwani installed a six (6) station network in the area.
On November 25, 1975, a magnitude 3.2 earthquake was recorde'd at Lake Jocassee. This event was felt over a large area.
Dr. Talvani stated that in his analysis, the epicenters were progressing continually downward. Two hundred aftershocks were recorded.
(As per a later conversation with B. Epps o'f Region II, Office of Inspection and Enforcement, this event tripped a seismic instrument located in the reactor tendon i
e W
Willian P. Gamml)) -
I T- '
gallery.
These instru:nonts vere set to trip at 01g. One did trip and there-has been some difficulty in getting the records analyzed due to closing of the company that supplied the instruments.)
On December 8,. two or three shocks were felt ranging from magnitude 2.5-2.7.
Dr. Talwani also stated that there have been a number of other events of magnitude 2 or more.
In a Inter telecon uith Bud Epps of. Region II, Office of Inspection and Enforcement, he stated that he was aware of the early fall event, probably October 1, 1975 and the November 25 carthquake.
The former was not felt at the plant, the latter was discussed earlier. He has received telephone communication on a number of occasions when I
earthquakes were noted at Lake Jocassee but only the November 25 l
shock caused the seissic instruments to be triggered.
n
[kobertE.Jp' hon,Geolog ic t-
O gC t'