ML19329A149
| ML19329A149 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 04/12/1976 |
| From: | Grimes B Office of Nuclear Reactor Regulation |
| To: | Purple R Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7912300164 | |
| Download: ML19329A149 (1) | |
Text
l s:.'.
j e
APR 121976 g
l Robert A. Purple, Chief, Operating Reactors Branch No.1 COMMENIS ON OCONEE SEMI-ANNUAL NON-RADIOLOGICAL OPER l
The Environmental Evaluation Branch has reviewed the se:mi-annu non-rsdiological operating report for Oconee Nuclear Station covering 31, 1975. We find that the report meets the period auding December the reporting requirements and further that reduction in The utility is reporting more data than are near-field monitoring.
Reductions actually required by current technical specifications.(1) eliminate the repor
'could be made in two areas:
are not required in the technical specifications and -(2) change certain technical specificationsreporting requirements to require less extensive monitoring.
.We recte.=nd that the utility be informed that we will consider a lessen-As'we are considering a reduction in
.ing of the reporting requirements.
' requirements, it should be the utilities' option whether or not' to pursue c
It may be that the data must be collected to satisfy state require-If they choose to do so, it would be appropriate to have a meeting it.
with them during which we would desetihe the changes that could be made.
ments.
This review was performed by W. Pasciak of the Environmental Evaluation Branch.
Brian K. Grimes, Chief
.wironmental Evaluation Branch Division of Operating Reactors Office of Nuclear Reactor Regulation i
cc:
V. Stallo f
D. Eisenhut Distribution:
Central File W. Pasciak NRR - Edg.
C. Zack EEB - Rdg.
~S. Block _
B. Grimes K. Coller L. Barrett E.'Adensam
,f T. Cain
/> U/
t EE g
H
.,,ie.
- 1%s#
WPake s
cts i
y _,
-n,
? G 4 /,/76' 4111/76 s
- =
..v..==..mm...., ice i.u.
i s "'-
ss) anos esas
- 7912300 /6/.[
.