p:JT; j
- ... ~,..,q;,
4
'.A.
- e,,
~
' y
.4 '
fwa j
Southem Califomia Edison Company C
33 einxon sTacci O"'
inviNc, cAciroRNiA 927i0 i
L
.J j
s r. n. nanav.
November 13, 1989 1
w m e,.~on,
~...o,~ucte..uc ~~uo m u..r..oo 1
9 l
'U. S. Nuclear Regulatory Commission l
, Document Control Desk -
y < j Washington, D.C.
20555'
Subject:
Docket No. 50-206
~
Report of NPDES Permit Violation-San Onofre Nuclear Generating Station, Unit 1 LPursuant to Section 6.16.2.c of Appendix A.
Technical Specifications,. to Provisional Operating License No. DPR-13 for San Onofre Unit 1, enclosed is a copy of the September 1989 monthly NPDES report summary for Unit 1.
The report summary includes.a description of a violation of the NPDES permit. There were no-violations at either Unit 2 or Unit 3 during September.
If you~ require' any additional information, please so advise.
Sincerely,
[
I I
i A-1 e
Enclosure
.cc:
J. B. Martin (Regional Administrator, USNRC Region V)
C'.: W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2, and 3)
\\l, l
- 8911210!64 891113 I-PDR-ADOCK 05000206 M
s PDC i
s i
g
+
g in
.-;ans
. r.
+
'i
!s.
t
%. t
}.,, N -]; _ M ;
h5 y
6 7
f l,.
l en O, '
t y..# "' y.
j Southern California Edison Company
,5CG W
l f
iL '.
...,..e...m.........,,..v.,,,,,
1 n
..... o x i..
S AN C L.M.N,,, C A blF O.N. A $3$7 -
1 October 27, 1989' j
a,
~
i 1.
Mr.. Ladin Delaney,. Executive Officer g
California Regional.Wster Quality Control Board
,f
' San Diego Region L9771 Clairemont Mesa Boulevard, Suite B San Diego,. California 92124-1331-N y
I
Dear Mr.. Delaney:
,q 4
a i
Subject:
' NPDES Monitoring Report
~'
M,
~
San Onofre Nuclear Generating Station, Unit 1
,j
- 0
-9 p.
g IThe SONGS monitoring' report covering the month of September is submitted in Jaccordance with the requirements of CRWQCB Order 88-001 (NPDES Permit No.
.CA0001228). 'A' summary of the generating unit's status and significant analytical results is provided below. '
o t
~
The unit was operational during Septembe'r. All sampled water sources were found to be.within')ermit limits, except the Mesa Sewage Treatment Plant l
effluent which was ligh on settleable solids September first due to hydraulic overload. This,was due to the unanticipated early shutdown of one:of the units.for refueling and the associated influx of contractors awaiting badge
']
processing. The situation was solved by starting up train "B" and increasing the amount of treatment plant in use.
- Pursuant'to Order No.88-001, Reporting Requirement 12, the following y
representative is authorized to sign and certify'all reports required by this 3
order:~. ' Arthur Kneisel, Environmental Engineer.
I-certify under penalty of law that I have 3ersonally examined and am familiar with the information submitted in the attacled document, and based on my inquiry of those individuals immediately responsible for obtaining the
'l information, I believe the submitted information is true, accurate, and complete.
I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.
L, Sincerely, q
1.
h B. Katz L
Manager, Site Support Services j
Enclosure,
(
[
[
-cc:!
Environmental Protection Agency, Region IX j
l....
OW '