NPDES Noncompliance Notification:On 890901,Mesa Sewage Treatment Plant Effluent Found High on Settleable Solids. Caused by Hydraulic Load.Train B Started & Amount of Treatment Plant in Use Increased
ML19327C205
Person / Time
Site: San Onofre 
Issue date: 11/13/1989
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911210164
Download: ML19327C205 (2)


Text

p:JT; j

... ~,..,q;,

4

'.A.

e,,

~

' y

.4 '

fwa j

Southem Califomia Edison Company C

33 einxon sTacci O"'

inviNc, cAciroRNiA 927i0 i

L

.J j

s r. n. nanav.

November 13, 1989 1

w m e,.~on,

~...o,~ucte..uc ~~uo m u..r..oo 1

9 l

'U. S. Nuclear Regulatory Commission l

, Document Control Desk -

y < j Washington, D.C.

20555'

Subject:

Docket No. 50-206

~

Report of NPDES Permit Violation-San Onofre Nuclear Generating Station, Unit 1 LPursuant to Section 6.16.2.c of Appendix A.

Technical Specifications,. to Provisional Operating License No. DPR-13 for San Onofre Unit 1, enclosed is a copy of the September 1989 monthly NPDES report summary for Unit 1.

The report summary includes.a description of a violation of the NPDES permit. There were no-violations at either Unit 2 or Unit 3 during September.

If you~ require' any additional information, please so advise.

Sincerely,

[

I I

i A-1 e

Enclosure

.cc:

J. B. Martin (Regional Administrator, USNRC Region V)

C'.: W. Caldwell (USNRC Senior Resident Inspector, Units 1, 2, and 3)

\\l, l

8911210!64 891113 I-PDR-ADOCK 05000206 M

s PDC i

s i

g

+

g in

.-;ans

. r.

+

'i

!s.

t

%. t

}.,, N -]; _ M ;

h5 y

6 7

f l,.

l en O, '

t y..# "' y.

j Southern California Edison Company

,5CG W

l f

iL '.

...,..e...m.........,,..v.,,,,,

1 n

..... o x i..

S AN C L.M.N,,, C A blF O.N. A $3$7 -

1 October 27, 1989' j

a,

~

i 1.

Mr.. Ladin Delaney,. Executive Officer g

California Regional.Wster Quality Control Board

,f

' San Diego Region L9771 Clairemont Mesa Boulevard, Suite B San Diego,. California 92124-1331-N y

I

Dear Mr.. Delaney:

,q 4

a i

Subject:

' NPDES Monitoring Report

~'

M,

~

San Onofre Nuclear Generating Station, Unit 1

,j

0

-9 p.

g IThe SONGS monitoring' report covering the month of September is submitted in Jaccordance with the requirements of CRWQCB Order 88-001 (NPDES Permit No.

.CA0001228). 'A' summary of the generating unit's status and significant analytical results is provided below. '

o t

~

The unit was operational during Septembe'r. All sampled water sources were found to be.within')ermit limits, except the Mesa Sewage Treatment Plant l

effluent which was ligh on settleable solids September first due to hydraulic overload. This,was due to the unanticipated early shutdown of one:of the units.for refueling and the associated influx of contractors awaiting badge

']

processing. The situation was solved by starting up train "B" and increasing the amount of treatment plant in use.

- Pursuant'to Order No.88-001, Reporting Requirement 12, the following y

representative is authorized to sign and certify'all reports required by this 3

order:~. ' Arthur Kneisel, Environmental Engineer.

I-certify under penalty of law that I have 3ersonally examined and am familiar with the information submitted in the attacled document, and based on my inquiry of those individuals immediately responsible for obtaining the

'l information, I believe the submitted information is true, accurate, and complete.

I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

L, Sincerely, q

1.

h B. Katz L

Manager, Site Support Services j

Enclosure,

(

[

[