ML19327B864

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Deleting Figures 6.2.1-1 & 6.2.2-1 Re Organization
ML19327B864
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/03/1989
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19327B858 List:
References
NUDOCS 8911140091
Download: ML19327B864 (9)


Text

_ _

{- i 1 INDEX  :

c, l c  !

. 1 ADMINISTRATIVE CONTROLS 1

SECTION PAGE 6.1 RESPONS'81LITY................................................... 6-1.

6.2 -ORGANIZATION..................................................... 6-1 l 6.2.1 0FFSITE AND ONSITE ORGANIZATION.............................. 6-1 1

1 1

, figure 6.2.1-1 DELETE 0................................. 6-3  ;

STAFF...........................

6.2.2 UNIT ....................... 6-2 i Figure 6.2.2-1 0ELETED................................. 6-4 Table 6.2.2-1 Minimum Shift Crew I Composition............................. 6-5 6.2.3 INDEPENDENT SAFETY ENGINEERING GROUP ,

t function..................................................... 6-6  ;

a Composition.................................................. 6-6

. Responsibilities............................................. 6-6 Records...................................................... 6-6 l!

6.2.4 SHIFT TECHNICAL ADVIS0R...................................... 6-6 I I

6.3 UNIT STAFF 0VALIFICATIONS........................................ 6-7 1

6.4 TRAINING......................................................... 6-7 6.5 REVIEW AND AUDIT 6.5.1 PlantOperationsReviewCommittee(PORC) i Function...................................................... 6-7 -

l Composition.................................................. 6-7 Alternates................................................... 6-7 Meeting frequency............................................

6-7 1

Quorum....................................................... 6-7 Responsib111 ties............................................. 6-8 Records...................................................... 6-9 l

LIMERICK - UNIT 1 xxvi 8911140091 891103 PDR ADOCK 05000352 P PDC

l i

60 ADMINISTRATIVE CONTROLS j 7

. J l

6.1 RESPONSIBILITY l l

l 6.1.1 The Plant Manager shall be responsible for overall unit operation and shall i delegate in writing the succession to this responsibility during his absence. i 6.1.2 The Shift Supervisor, or during his absence from the control room, a designated individual shall be responsible for the control room connand function. i A management directive to this effect, signed by the Vice President, Limerick .

Generating Station shall be reisst.ed to all station personnel on an annual basis. '

6.2 ORGANIZATION f

6.2.1 0FFSITE AND ONSITE ORGANIZATIONS  ;

Onsite and offsite organizations shall be established for unit operation and  !

corporate management, respectively. The onsite and offsite organizations shall  :

include the positions for activities affecting the safety of the nuclear power  ;

plant.

i

a. Lines of authority, responsibility, and communication shall be i established and defined for the highest management levels through  ;

intermediate levels to and including all operating organizational i positions. These relationships shall be documented and updated, as -

appropriate, in the form of organizational charts, functional  ;

descriptions of departmental responsibilities and relationships, and job (

descriptions for key personnel positions, or in equivalent forms of  ;

documentation. These requirements shall be documented in the Limerick  !

Quality Assurance Program.

[

t

b. The Plant Manager shall be responsible for overall unit safe operation -

and shall have control over those onsite activities necessary for safe 1 operation and maintenance of the plant. .

t

c. The Vice President. Limerick Generating Station shall have corporate ,

responsibility for overall plant nuclear safety and shall take any i measures needed to ensure acceptable perfomance of the staff in i operating, maintaining, and providing technical support to the plant to  :

ensure nuclear safety. ,

i

d. The individuals who train the operating staff and those who carry out health physics and quality assurance functions may report to the '

appropriate onsite manager; however, they shall have sufficient organizational freedom to ensure their independence from operating pressures.

i i

LIMERICK - UNIT 1 6-1 Amendment No. 10

ADMINISTRATIVE CONTMOLS

.' 6.F.2 UNIT STAFF

a. Each on duty shift shall be composed of at least the minimum shift crew composition shown in Table 6.2.2-1; i j
b. At least one licensed Operator shall be in the control room when fuel is in the reactor. In addition, while the unit is in OPERATIONAL CONDITION  !

1, 2, or 3, at least one licensed Senior Operator sha M be in the control room,

c. A Health Physics Technician
  • shall be on site when fuel is in the t

reactor;

d. ALL CORE ALTERATIONS shall be observed and directly supervised by either f a licensed Senior Operator or licensed Senior Operator Limited te fuel  :

Handling who has no other concurrent responsibilities during this '

operation; i

e. A sita fire brigade of at least five members shall be maintained on site at all times *. The fire brigade shall not include the Shift Superintendent, the Shift Technical Advisor, nor the two other members of ,

the minimum shift crew necessary for safe shutdown of the unit and any '

personnel required for other essential functions during a fire emergency; l

+

f. Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions (e.g.,  :

licensed Senior Operators, licensed Operators, health physicists, auxiliary operators, and key maintenance personnel).

Adequate shift coverage shall be maintained without routine heavy use of l overtime. The objective shall be to have operating personnel work a  !

normal 8-hour day, 40-hour week while the unit is operating. However, in i' the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for i

refuelina, major maintenance, or major unit modifications, on a temporary l basis the following guidelines shall be followed*

1. An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> h straight, excluding shift turnover time. '
2. An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, i nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period, all excluding shift  !

turnover time.

l

3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time. {
4. Except during extended shutdown periods, the use of overtime should  ;

be considered on an individual basis and not for the entire staff on t a shift.

T The Health Pt:ysics Technician and fire brigade composition may be less than the l Cinimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to

! accommodate unexpected absence, provided immediate action is taken to fill the required positions.

LIMERICK - UNIT 1 6-2 Amendment No. 10 l - - _ - . . . _ . _ - _ _ - -- - - .

f-j- ADMINISTRATIVE CONTROLS UNITSTAFF(Continued)

Any deviation from the above guidelines shall be authorized by the Plant Manager or personnel designated in administrative procedures or higher l 1evels of management. In accordance with established procedures and with

' documentation of the basis for granting the deviation. Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager, or the appropriate designated personnel to assure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized; and

g. The Plant Manager or the Superintendent Operations, and the Assistant Superintendent-Operations shall hold a Senior Reactor Operator License.

The Superintendent Technical or the Technical Engineer shall hold a Senior Reactor Operator License.

l l

l i

1 i

i

)

LIMERICK - UNIT 1 6-3 Amendment No. 10 i l \

1 l

3 l

p ,

< t lp ,

. , l

,3

(

i 4

This page is intentionally left blank i

i l <;

l.IMERICK-UNIT 1 6-4 Amendment No. 10 4

4 0

ADMINISTRATIVE CONTROLS

. 6.2.3 INDEPENDENT SAFETY ENGINEERING GROUP (ISEG) i FUNCTION  !

642.3.1 The ISEG shall function to examine unit operating characteristics, NRC issuances, industry advisories, Licensee Event Reports, and other sources of unit design and operating experience information, including units of similar design, which may indicate l

areas for improving unit safety. The ISEG shall make detailed recommendations for revised i procedures, equipment modifications, maintenance activities, operations activities, or  !

s other.means of improving unit safety. 6 General Manager-Nuclear Quality Assurance to the Executive Vice President-Nuclea I

COMPOSITION i 6,2.3.2 The Limerick ISEG shall be composed of at least five, dedicated, full-time engineers, including the ISEG Superintendent, located onsite. Each shall have a bachelor's degree in engineering or related science and at least two years professional level experience in his or her field. The Limerick ISEG Superintendent shall have at least six years of experience in the nuclear field. The LGS ISEG reports to the General  :

Manager - Nuclear Quality Assurance. '

RESPONSIBILITIES 6.2.3.3 The ISEG shall be responsible for maintaining surveillance of unit activities to provide independent verification

  • that these activities are performed correctly and that human errors are reduced as much as practical.

[

,R_ECORDS 6.2.3.4 Records of activities performed by the ISEG shall be prepared, maintained, and l forwarded each calendar month to the General Manager - Nuclear Quality Assurance.

l ll 6,2.4 SHIFT TECHNICAL ADVISOR 6.2.4.1 The Shift Technical Advisor shall provide advisory technical support to Shift Supervision in the areas of thermal hydraulics, reactor engineering, and plant analysis with regard to safe operation of the unit. The Shift Technical Advisor shall have a ,

bachelor's degree or equivalent in a scientific or engineering discipline and shall have  ;

received specific training in the response and analysis of the unit for transients and t accidents, and in unit design and layout, including the capabilities of instrumentation and controls in the control room. +

63 UNIT STAFF QUALIFICATIONS 6.3.1 Each u mber of unit staff shall meet or exceed the minimum qualifications of ANSI /ANS 3.1-1978 for comparable positions, except for the Senior Health Physicist who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975. The licensed Operators and Senior Operators shall also meet or exceed the minimum qualifications of the supplemental requirements specified in Sections A and C of Enclosure 1 of the Parch 28, 1980 NRC letter to all licensees.

t

  • Not responsible for sign-off function.

1 LIMERICK - UNIT 1 6-6 Amendment No. 10

j l i l .

\

ADMINISTRATIVE CONTROLS

~

l v

RESPONSIBILITIES (Continued) )

c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Vice President, Limerick  ;

Generating Station and the Nuclear Review Board of disagreement between the PORC i and the Plant Manager; however, the Plant Manager shall have responsibility for .

resolution of such disagreements pursuant to Specification 6.1.1. l RECORDS l 6.5.1.8 The PORC shall maintain written minutes of each PORC meeting that, at a minimum, l document the results of all PORC activities performed under the responsibility provisions of -

these Technical Specifications. Copies shall be provided to the Vice President, Limerick

- Generating Station, Plant Manager, and the Nuclear Review Board. l

, ,6. 5. 2 NUCLEAR REVIEW BOARD (NRB) ,

, FUNCTION 6.5.2.1- The NRB shall function to provide. independent review and audit of designated  !

activities in the areas of:

a. Nuclear power plant operations. .
b. Nuclear engineering.
c. Chemistry and radiochemistry, t
d. Metallurgy,  ;
e. Instrumentation and control,
f. Radiological safety, ,
g. Mechanical and electrical engineering, and i ,

l

h. Quality assurance practices.  ;

l The NRB shall report to and advise the Executive Vice President - Nuclear on those areas of .

responsibility in Specifications 6.5.2.7 and 6.5.2.8.

I COMPOSITION I

-6.5.2.2 The Chairman, members, and alternates of the NRB shall be appointed in writing by -

the Executive Vice President - Nuclear, and shall have an academic degree in an engineering l

, cr physical science field; and in addition, shall have a minimum of 5 years technical l

experience, of which a minimum of 3 years shall be in one or more areas given in l Specification 6.5.2.1. The NRB shall be composed of no less than eight and no more than 12 members.

i The members ar.d alternates of the NRB will be competent in the area of Quality Assurance practice and cognizant of the Quality Assurance requirements of 10 CFR Part 50, Appendix B.

Additionally, they will be cognizant of the corporate Quality Assurance Program and will have the corporate Quality Assurance organization available to them.

LIMERICK - UNIT 1 6-9 Amendment No. 10

--,a-- - w .- --- s ,, , ~ - - . - - .

g

,' , ADMINISTRATIVE CONTROLS f

L i AUDITS (Continued)

k. The radiological environmental monitoring program and the results thereof at least once per 12 months. ,
1. The OffSITE DOSE CALCULATION MANUAL and implementing pror.edures at least once per 24 months, i
m. The PROCESS CONTROL PROGRAM and implementing procedures at least once per  :

24 months.

n. The performance of activities required by the Quality Assurance Program to meet the criteria of Regulatory Guide 4.15, December, 1977, at least once per 12 months. ,

r RECORDS ,

6.5.2.9 Records of NRB activities shall be prepared, approved, and distributed as indicated below

a. Minutes of each NRB meeting shall be prepared, approved, and forwarded to the Executive Vice President - Nuclear within 14 days following each l meeting, i
b. Reports of reviews encompassed by Specification 6.5.2.7 shall be  ;

prepared, approved, and forwarded to the Executive Vice~ President -

Nuclear within 14 days following completion of the review. l ,

c. -

Audit reportsOfficer the Corporate encompassed by Specification (s) and management 6.5.2.8 shall positions responsible for thebe forwarded areas audited within 30 days after completion of the audit by the auditing organization.

6.6 REPORTABLE EVENT ACTION  ;

6.6.1 The following actions shall be taken for REPORTABLE EVENTS:  !

h. The Commission shall be notified and a report submitted pursuant to the  !

requirements of Section 50.73 to 10 CFR Part 50, and  ;

D. Each REPORTABLE EVENT shall be reviewed by the PORC and submitted to the NRB, Plant Manager and the Vice President, Limerick Generating Station. ,

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated: .

a. The fiRC Operations Center shall be notified by telephone as soon as possible and in all cases within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. The Vice President, Limerick Generating Station, Plant Manager, and the NRB shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

LIMERICK - UNIT 1 6-12 Amendment No. 10

n --

, + ADMINISTRATIVE CONTROLS PROCESS CONTROL PROGRAM,(Continued)

2. A determination that the change did not reduce the overall conformance of the solidified waste product to existing criteria for i solid wastes; and
3. Documentation of the fact that the change has been reviewed and found acceptable by the PORC. .
b. Shall become effective upon review and acceptance by the PORC.

6.14 0FFSITE DOSE CALCULATION MANUAL (ODCM) 6.14.1 The ODCM shall be approved by the Commission prior to implementation.

6.14.2 Licensee-initiated changes to the ODCM:

a. Shall be submitted to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change (s) was made effective. This submittal shall contain:
1. Sufficiently detailed information to totally support the ration F for the change without benefit of additional or supplemental information. Information submitted should consist of a package of those pages of the 00CM to be changed with each page numbered and provided with an approval and date box, together with appropriate analyses or evaluations justifying the change (s);
2. A determination that the change will not reduce the accuracy or reliability of dose calculations or setpoint determinations; and
3. Documentation of the fact that the change has been reviewed and i found acceptable by the PORC. I
b. Shall become effective upon review and acceptance by the PORC.

6.15 MAJOR CHANGES TO RADIOACTIVE WASTE TREATMENT SYSTEMS 6.15.1 Licensee-initiated major changes to the radioactive waste systems (liquid, gaseous, and solid):

a. Shall be reported to the Commission in the Semiannual Radioactive Effluent Release Report for the period in which the change was made effective. The discussion of each change shall contain:
1. A summary of the evaluation that led to the determination that the change could be made in accordance with 10 CFR 50.59; LIMERICK - UNIT 1 6-22

.