Text
@.],;,
~~
l w.
i le ;
I-
)
i
~(4) Fire Protection i
The licensee may proceed with and is required to complete the modifications identified in Paragraphs 3.1.1 through 3.1.29 of the NRC's Fire Protection Safety Evaluation (SE),
i dated April 4, 1979, for the facility. These modifications j
will be completed in accordance with Table 3.1 of the SE and R
i supplements thereto.
\\
In addition, the licensee shall submit the additional information identified in Table 3.T of this SE in accordance R
with the schedule contained herein.
In the event these dates 4
l fer submittal cannot be met, the licensee shall submit a re) ort, explaining the circumstances, together with a revised h
sc1edule.
i The licensee is required to implement the administrative 1
controls identified in Section 6 of the SE. The administrative controls shall be in effect immediately, except for those j
mooifications indicated in Section 3.1 of the SE, which shall become effective on the dates indicated in Table 3.1 of the SE.
l (5) PJhy,sicalProtection The licensee shall fully implement and maintain in effect all
)
provisions of the physical security, guard training and qualification, and safeguards contingency plans previously i
approved by the Comission ard all amendraehts and revisions te such plans made pursuant to the authority of 10 CFR 50.90 I
and10CFR50.54(p). The plans, which contain Safeguards i
information protected under 10 CFR 73.21, entitled:
" Big Rock
',R Point Plant Security Plan," with revisions submitted through St.
i September 29, 1988; " Big Rock Point Plant Suitability Training and me Qualification Plan," with revisions submitted through November 30, OR 1988; and " Big Rock Point Plant Safeguards Contingency Plan,"
,_ s with revisions submitted through September 30, 1988.
Changes gg made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
i 1
0911030112 891025 PDR ADOCK 05000155
)
P PDC
)
l