ML19327B549

From kanterella
Jump to navigation Jump to search
Clarifies 890721 Response to Request for Addl Info Re FSAR Chapter 12,providing Schedule for Completion of Addl Shielding Mod & Barrier Extension Around Spent Fuel Transfer Tube
ML19327B549
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/26/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89772, NUDOCS 8911010214
Download: ML19327B549 (1)


Text

..

k i

L

+

=g i

""" ".:"l Log # TXX 89772 C.

File # 10030 l

r C

912.3

[

1UELECTRIC October 26, 1989 William J. Cabin, Jr.

I:xecutive nx hest. tent U. S. Nuclear Regulatory Commission l

Attn: Document Control Desk

[

Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET N05. 50-445 AND 50-446 CLARIFICATION OF TV ELECTRIC'S RESPONSE TO THE RAI FOR FSAR CHAPTER 12 REF: TV Electric letter to the NRC, logged TXX-89476, dated July 21, 1989 Gentlemen:

In the referenced letter, TU Electric stated that design modifications were pending for installing additional shielding around.the spent fuel transfer' tube and for extending the height of the access control barriers around the i

spent fuel transfer tube and the upper level incore instrumentation area.

The i

response was not specific regarding the schedule for completion of these activities; therefore, the following information is provided.

The additional shielding modification and barrier extension around the spent fuel transfer tube are scheduled to be completed by the first scheduled refueling outage.

If irradiated fuel movement is necessary prior to the first scheduled refueling outage, administrative controls, consisting of access control points as a minimum, shall be employed during periods of irradiated fuel movement.

The barriers in the upper level incore instrument room are scheduled to be modified prior to Unit 1 initial criticality.

Administrative controls will l

also be employed, as needed, prior to these modifications being l completed.

l' TV Electric believes these clarifications should, answer the staff's questions regarding the schedule for completion of these. modifications.

If there are additional questions, please contact Greg Bell at' 214-812-4373.

3 Very truly yo 8911010214 391026 Q

l ADOCK 0%[4 l

PDR 5-j p

William J. Cahill, Jr.