ML19327B523
| ML19327B523 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/25/1989 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML19327B524 | List: |
| References | |
| NUDOCS 8911010054 | |
| Download: ML19327B523 (2) | |
See also: IR 05000352/1989018
Text
, , .
,
.h
'
1
- c -
' t,
j
e
,
25 00T 1989
1
Docket Nos. 50-352
"
50-353
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill, Jr.
Executive Vice President-Nuclear
Correspondence Control Desk
P.O. Bo>. 7520
Philadelphen, Pennsylvanit 19101
knt ievr.:
Subject:
Inspection Wu. 50-352/89-14 and 50-353/89-26.
This letter trr.ns'ett., t.he routir.e resident safety inspection by Messrs.
'
7. Kenny, L, Scholl, R. Fuhrmeister and Ms. M. Evans from July 31-September
11, 1989 at the Limerick Generating Station, ttmerick, Pennsylvania.
The
inspection cons fted of document reviews, interviews, and observations of
activities. The results have been discussed with Mr. Graham Leitch and
Mr. Martin McCormick, Jr. of your staff.
Within the scope of this inspection, no violations were identified. However,
we are concerned about the failure to follow a procedure which led to three
workers being overcome with heat exhaustion during the performance of control
rod drive cleaning. There have been two other similar incidents involving heat
exhaustion during approximately the last two years and it appears this area
requires increased management attention.
In accordance with 10 CFR 2.79(a), a copy of this letter and the enclosures
will be placed in the Public Document Room.
.Your cooperation with us is appreciated.
Sincerely,
.
ames C. Linv111 , hief
Projects Branch Io. 2
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-352/89-18 and 50-353/89-26
1
,
OFFICIAL RECORD COPY
IR LIM 89-18/89-26 - 0001.0.0
e911olooc4 89102's
10/25/89
,
ADOCK 05000352
/[
\\\\
i
Q
,
//p'
_
, _
J
$7 ..
a
,
e
, . .
~
.c
Philadelphia Electric Company
2
25 00T 1989
cc w/er.cls:
J. S. Kemper, Sr., Senior Vice President - Nuclear Construction
G. M. Leitch, Vice President
. Limerick Generating Station
S. J. Kowalski, Vice President - Nuclear Engineering
D. R. Helwig, General Manager - Nuclear Services
[
M. J. McCormick, Jr., Manager - Limerick Generating . Station
W. T. Ullrich, Project Manager - Limerick Generating Station
'
.
' A. S. MacAinsh, Manager - Limerick Quality Division
G. A. Hunger, Jr., Director - Licensing Section
T. B. Conner, Jr. , Esquire
E. J. Bradley, Esquire. Assistant General Counsci
H. D. Honan Branch Head - Nuclear Engineering Licensing
Public Document Room (PDR)
,'y3
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
.,
lg
Commonwealth.of. Pennsylvania
-
E
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
L. Doerflein, Section Chief. DRP
J. Dyer, EDO Office
<
R. Clark, NRR Project Manager
l
T. Johnson, SRI, Peach Bottom
'
T. Kenny, SRI, Limerick
P. Kaufman, Project Engineer
s
L
i
i
L
j.
'
I:DRP
P
RI:DRP
gKenny
Doerflein
Linville
!
10/;LY89
10/33/89
10/ /89
0FFICIAL RECORD COPY
IR LIM 89-18/89-26 - 0002.0.0
10/20/89
..