ML19327A938

From kanterella
Jump to navigation Jump to search
Forwards Final Rept, Reactor Containment Bldg Integrated Leak Rate Test, Conducted 890704-07,per 10CFR50,App J, Paragraph V.B
ML19327A938
Person / Time
Site: Comanche Peak 
Issue date: 10/11/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19327A939 List:
References
TXX-89749, NUDOCS 8910240013
Download: ML19327A938 (1)


Text

~~

f1 8

l r

W t

s',

MM 1

5'e

""" 9 Log # TXX-89749 1

.~

File # 10010

.l r

C 906.2 filELECTRIC Ref. # 10CFR50. App J l

y W. J. Cahill October 11, 1989 n, nan, v,c, r,,w,,u j

U. S. Nuclear Regulatory Commission j

Attn: Document Control Desk Washington D. C.

20555 l,'

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NO. 50 445 TRANSMITTAL OF THE REACTOR CONTAINMENT BUILDING INTEGRATED LEAKAGE RATE TEST REPORT y.

Gentlemen The CPSES Unit 1 Prestart Test Program Integrated Leakage Rate Test (ILRT) was conducted during the period July 4-7, 1989.

In accordance with 10CFR50

.3 Appendix J, paragraph V.B. enclosed is a summary technical report entitled

" Reactor Containment Building Integrated Leakage Rate Test" which provides the required information.

Sincerely,

.J"f2

~

William J. Cahill, Jr.

i BSD/bsd Enclosure f

c - Mr. R. D. Martin, Region IV Resident Inspectors CPSES (3)

I 1

1((

i 8910240013 891011 PDR ADOCK'05000445 ff A

PNV

/

)

N en wra, otwe strees ta as varias. rexas mot s

e J6a

~,

-<_,.-~,,

-