ML19327A537

From kanterella
Jump to navigation Jump to search
Forwards Revision 6 of Industrial Security Plan.Plan Withheld (Ref 10CFR2.790)
ML19327A537
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/04/1980
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NO-80-1110, NUDOCS 8008060344
Download: ML19327A537 (1)


Text

.-

~.,:-

z.-
-

File: NC-4001(B) Serial: NO-80-1110 Office of Nuclear Reactor Regulation ATTENTION: 12. T. A. Ippolito, Chief Operating Reactors Branch No. 3 United States Nuclear Regulatory Commission Washington, D. C. 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. 09R-71 AND DPR-62 REVISED INDUSTRIAL SECURITY PLAN

Dear Mr. Ippolito:

In accordance with the Code of Federal Regulations, Title 10, Part 50.54(p), Carolina Power & Light Company (CP&L) herewith transmits five (5) copies of Revision 6 of the Industrial Security Plan for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.

In previous revisions of our Security Plan, CP&L had made various commitments in order to comply with the provisions of 10CFR73.55 and to obtain NRC approval of the plan. Revision 6 contains substantial changes to the plan thai: result from incorporation of past commitments and from changes in the CP&L organizational structure. In addition to describing the upgraded security system at Brunswick, Revision 6 also adopts the suitability and qualifications requirements for security personnel that are contained in Appendix B of 10CFR73.

Revision 6 of the Brunswick Industrial Security Plan contains no changes which would decrease the effectiveness of the plan or the level of security provided.

Revision 6 of the Industrial Security Plan contains detailed security measures for the physical protection of the Brunswick Plant. This document is submitted to NRC under the provision of Section 2.790(d) of 10CFR Part 2.

We therefore request that this information be withheld from public disclosure in accordance with 10CFR9.5(a)(4).

Please contact us should you have any questions regarding this information.

Yours very truly,

-t It-  % Q[

E.'E. Utley Executive Vice President b Power Supply and Engineering & Construction JBW/ JAM /dk

.::7;r:~::

.; T::~^{~~

~

8008000 3 N h