ML19327A364
| ML19327A364 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/24/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Hines E DETROIT EDISON CO. |
| References | |
| NUDOCS 8008060084 | |
| Download: ML19327A364 (1) | |
Text
L t
UMTED STATES
/
at*y%
NUCLEAR REGULATORY COMMISSION
[
REGION lti o
~f 799 ROOSEVELT ROAD g,
,f O u ~ u tv,..
cu,.0,s. m,
JUL' 2 4 G80' Docket No. 50-341 The Detroit Edison Company ATTN: Mr. Edward Hines, Assistant Vice President and Manager Quality Assurance 2000 Second Avenue Detroit, MI 48226 Gentlemen:
Thank you for your interim report dated July 10, 1980, pursuant to 10 CFR 50.55(e) regarding Containmenc Gas Monitoring System. We will review your final report on this matter upon receipt.
Your cooperation with us is appreciated.
Sincerely,
_s_ 00_
Gaston Fiore111, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/II Director, AEQD Chief, OEB/MPA IE Files cc w/ltr dtd 7/10/80:
Central Files PDR Local PDR NSIC Ronald Callen, Michigan Public Service Commission Eugene B. Thomas, Jr.,
Attorney 1
soosoeo0 W '
S
4.
Detroit July 10, 1980
@ 2 coo secona Avenu.USMU.'j"$an 4s22s EF2-49,018 e
Mr. James C. Keppler Directorate of Regulatory Operations
- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Interim Report of 10CFR50.55(e) Item on Containment Gas Monitor-ing System.
Dear Mr. Keppler:
On June. 23, 1980, Mr. H.A. Walker of Detroit Edison's Quality Assurance Department, telephoned Mr. Van Dell of NRC-Region III to report that we had received notification from Comsip, Inc., the Supplier of the Fermi 2 Con-tainment Gas Monitoring System, that they had reported problems to NRC-Rcgion V under 10CFR21 requirements. It was reported that a pump malfunc-tion during a test at Comsip on a similar system had created excessive pressure which could conceivably rupture the diaphram, and breach the con-tainment integrity of the system.
The correspondence from Comsip, Inc. stated that a kit vill be made avail-able to add a by-pass on the discharge of the pump to prevent deadheading, which will eliminate excessive pressure and the possibility of this type of failure or damage. This kit and associated documentation have been requested by Detroit Edison.
A final report on this item is scheduled to be submitted to you before October 23, 1S80. If you have any questions concerning this matter, please contact Mr. H.A. Walker, Supervisor - Construction Quality Assurance.
Sincerely, W.J. Fahrner, Manager Enrico Fermi 2 WJF/ HAW /pn cc:
Mr. Victor Stello Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Comission Washington D.C.
20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Commission Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 JUL 181880 bpe_
5oo122.o 645
.