ML19327A155

From kanterella
Jump to navigation Jump to search
Forwards Std Order for DOE work:State-of-the-Art Review & Evaluation of Sys Interaction Methods, for Signature
ML19327A155
Person / Time
Issue date: 07/08/1980
From: Ross D
Office of Nuclear Reactor Regulation
To: Fremling A
Battelle Memorial Institute, PACIFIC NORTHWEST NATION
Shared Package
ML19327A156 List:
References
CON-FIN-B-2325, CON-FIN-B-2325-0 NUDOCS 8008010207
Download: ML19327A155 (2)


Text

-

THIS DOCUMENT CONT /.!NS POOR QUAUTY PAGES JUL 8 1980 fir. Alex G. Frenling, f4anager Rich 33nd Operations Office P. O. Box 550 Richland, Washington 99352

Dear.Mr. Fremling:

Subject:

PNL Technical Assistance to the Division of Systems Integration, NRR, NRC

" State-of-the-Art Review and Evaluation of Systems Interaction Methods" (B2325)

The enclosed NRC Fom 173, Standard Order for DOE Work, is hereby submitted in accordance with Section III, B.2 of the DOE /NRC ficcorandum of Understanding dated February 24, 1978.

Funding authorization in the amount of $40,000 to immediately begin work on the onclosed Statement of Work, which has been discussed with RichaPd Hidrig.9 of PNL, is provided by the enclosed NRC Fom 173. The balance of funds required for completion of this project will be provided incrementally for FY 1980 after receipt of an acceptable proposal.

Standard tems and conditions for NRC work, as provided in the DOE /NRC Memorandum of Understanding of February 24, 1978, and described in NRC Bulletin 1102c6 should be used as the basis for preparing a proposal.

If a portion of this work is; subcontracted out, we require that PNL have a professional assigned to the task who is qualified to defend the results. We also require that NRC approve i

the subcontractor pri6r to initiation of his effort. Please submit a proposal j

containing, as a minimum, the infomation set forth in Enclosure 2, proposal contract, in the format of the Statement of Work to:

Office of Nuclear Reactor Regulation

)

U. S. Nuclear Regulatory Connission Washington, D. C.

20555 ATTN:

B. L. Grenier If you have any questions concerning the acceptance of this order, please contact Mr. B. L. Grenier on FTS 492-7932.

Sincerely.

Original signsE %

A LA84tB M

D. F. Ross, Jr., Director Division of Systems Integration 80080102_O 7 Office of Nuclear Reactor Psegulation L

m

..BL - her PTriplett-DF s

O M S to'l zi,.....

a

.p nstein rs suRN.ME) 7 j.,..

Care >..............

N R C F O ^.M 318 (9 76) NRCM 0240 N U.S. GOVERNMENT PRINTING OFFICE: 1979 289-369

Jul.

8 1980 Mr. Alex G. Fremling

- 2'-

Enclosures:

1.

NRC Fom 173 2.

Proposal Content 3.

Statement of Work cc:

R. Barber, HQ-DOE R. Widrig, PNL istribution Central File NRR r/f /

DSI r/f Contract File (B. Grenier)

8. Grenier P. Triplett D. F. Ross L. Rubenstein J. Stolz SIB File D. Dandois (173 only)

J. Leonard T. Murley, RES G. Arlotto, STDS l

omee >................

sua =>..................

o 1c >................

...........