Text
_ _ _ . _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
/
\\
'
UNITED STATES
3 !
$
NUCLEAR REGULATORY COMMISSION
- (V {
nE
REGION 11
, ,
o,
[
101 MARIETTA ST N.W SulTE 3100
. ... g
AT
TA. GEORGIA 30303
5 1980
In Reply Refer To:
RII:WHM
50-327/80-17
50-328/80 10
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr., of this office on
May 13-15, 1980 of activities authorized by NRC Operating License No. DPR-77 and
Construction Permit No. CPPR-73 for the Sequoyah facility, and to the discussion
i
of our findings held with G. G. Stack at the conclusion of the inspection and
subsequent telephone discussion with J. B. Ballentine.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
Within the scope of this inspection, no items of noncompliance were disclosed.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as Appendix A.
Please provide us in writing within 20 days of your receipt of this letter your
comments including a description of corrective actions that have been or will be
taken, corrective actions which will be taken to avoid further deviations, and
the date corrective actions were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
' t is claimed that the information is proprietary, and should be prepared so
i
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
j
8008010/N
.
. . . . ,
.--
-
.- .... -
.-
_ - _
_ _ _ - - _ _ _ _ _ _ - _
- _., _
. ~ . .
. - . .
-
,
.
.
JUM-5 W
Tennessee Valley Authority
-2-
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
<AC
,
C. E. Murph , M
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Deviation
2.
Inspection Report Nos. 50-327/80-17
and 50-328/80-10
cc w/ enc 1:
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Comerce Street
W10C131 C-K
Knoxville, TN 37902
H. J. Burzynski, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
!.
Construction Engineer
Post Office Box 2000
Spring City, TN 37381
H. N. Culver
249-A HBB
400 Commerce Avenue
>
Knoxville, TN 37902
,
f;
e
9
, ., --