UNITED STATES
[58 "'%,#'
NUCLEAR REGULATORY COMMISSION o
7$-
REGloN IV "a,} @k. j I
C 611 RY AN PLAZA oRIVE, SulTE 100o ARLINGTON, TEXAS 76012 D...../
0 3 JUN 1980 f
1 Docket No. 99900505/80-01 EBASCO Services, Inc.
Atta: Mr. B. E. Tenzer, Director Materials Engineering and Quality Assurance Two World Trade Center New York, New York 10048 Gentlemen:
This refers to the QA Program inspection conducted by Mr. J. R. Costello of this office on April 21-25, 1980, of your facility at New York, New York, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the QA program inspection and our findings are i
discussed in the enclosed report. Within these areas, the inspection consisted of an enmination of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your QA program failed to meet certain commitments in your Topical Report i
No. ETR-1001. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of any steps that have been or will be taken to correct these items, (2) a descriptica of any steps that have been or will be taken to prevent recurrence, '.nd (3) the dates your corrective actions and preventive measures were or will be completed.
In accordance with Section 2.790 of the Coinnission's " Rules of Practice,"
Part 2 Title 10, Code of Federal Regulations,.a copy of this letter and ycur reply together with the enclosed inspection report will be placed in the Conunission's Public Document Room. If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure. Any such application nmst include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so 1
i 8008010/N'
EBASCO Services, Inc. that proprietary infor: nation identified in the application is contained in a separate part of the document.
If we do not hear.from you in this regard within the spa.cified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will.be pleased to discuss them with you.
Sincerely,
\\g (V
Uld
.otapovs, Chief Vendor Inspection Branch
Attachment:
Notice of Deviation Inspection Report No. 99900505/80-01 e