Order Granting 20-day Extension from 800518,for Springer to Reply to NRC 800708 Comments on Springer 800521 Affidavit
ML19327A043
Person / Time
Site: Perkins  
Issue date: 07/28/1980
From: Bowers E
Atomic Safety and Licensing Board Panel
To: Springer D
AFFILIATION NOT ASSIGNED
References
ISSUANCES-CP, NUDOCS 8008010095
Download: ML19327A043 (1)


Text

i

,,f UNITED STATES OF AMERICA

)'

1 NUCLEAR REGULATORY COMMISSION

/ '/

000K??TD T'.,

U}..", a c,cq >

Uum ATOMIC SAFETY AND LICENSING BOARD

%*' C{n:j,(tp]gl1,j Elizabeth S. Bowers, Chairman Dr. Walter H. Jordan i

""?$3n

'J

.x/

Dr. Donald P. de Sylva L,

In the Matter of

)

)

DUKE POWER COMPANY

)

Docket Nos. g-g STN- 0-4

-CP (Perkins Nuclear Station,

)

Lhits 1, 2 and 3)

)

REQUEST FOR ADDITIONAL TIME FROM MR. DAVID SPRINGER On July 19, 1980, Mr. Springer informed the Board that he had not been served with the Staff's com=ents of July 8, 1980 on his affidavit of May 21, 1980.

He stated he obtained a copy on May 18th and requested twenty (20) days from May 18 to srespond.

The request for additional time is granted.

All parties are resinded that Mr. Springer should be served.

We note the Applicant has served him but the Intervenors have not.

IT IS SO ORDERED.

FOR THE ATOMIC SAFETY AND LICENSING BOARD Y'

Elizj(Deth S.

Bowers, Chairman Dated at Bethesda, Maryland o 'l 5

this 28th day of July 1980.

) O 8008010 gf

b TR Commonwealth Edison

)

)

one First National Plaza. Chicago, Illinois

[

c

~)

G/

Address Reply ta: Post Offica Box 767

{

,N j Chicago, Illinois 60690 July 17, 1980 Mr. James G. Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Ruad Glen Ellyn, IL 60137'

Subject:

Dresden Station Units 2 and 3 Additional Response to IE Bulletin 80-17 NRC Docket Nos. 50-237/249 Reference (a):

J. G. Keppler letter to C. Reed dated July 3, 1980

Dear Mr. Keppler:

This letter provides the Commonwealth Edison response to Item 4 of IE Bulletin 80-17, which was transmitted by Reference (a).

To comply with Items 4.a through 4.d, the following procedures have been reviewed and revised:

DGP 2 Unit 2/3 Reactor Scram DGA 18 - Anticipated Transient with Incomplete Scram DOP 1100 Injection of Standby Liquid Control All items discussed in Items 4.a through 4.d were addressed as stated except Item 4.b.l.

Item 4.b.1 has been addressed in accordance with General Electric's letter to all BWR Operating Station Superintendents, dated July 2, 1980.

General Electric recommended that for adjacent rods, a two (2) rod criteria be applied as opposed to the five (5) rod criteria of IE Bulletin No. 80-17.

To comply with Item 4.e, the preliminary training consisting of a written summary and our plans for the 30-day training commitment was distributed on July 11, 1980 to all licensed personnel and other associated management personnel.

.g 1 Y Y

. =. _ _

1

i Mr. JOces G. Keppler, Dircctor July 17, 1980 I

Page 2 Please address any questions concerning this matter to this office.

Very truly yours, k5 Robert F. Janecek Nuclear Licensing Administrator Boiling Water Reactors cc:

Director, Division of Reactor Operations Inspection SUBSCRIBED and SWORN to before me is /7D/, day n

of V

, 1980 e

' Notary Public 5319A e