ML19326E267
| ML19326E267 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/16/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML19326E265 | List: |
| References | |
| NUDOCS 8008010023 | |
| Download: ML19326E267 (2) | |
See also: IR 05000338/1980020
Text
_ - - _ _ _ _
'
a
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
'
g
.
REGION 11
'
'*
o
101 MARIETTA ST., N.W., SUITE 3100
o
ATLANTA, GEORGIA 30303
MAY 1 61980
In Reply Refer To:
RII:EHW
50-338/80-20
50-339/80-21
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by E. H. Webster of this office on
April 21 through 25, 1980 of activities authorized by NRC License Nos. NPF-4 and
l
NPF-7 for the North Anna facility, . ad to the discussion of our findings held
with W. R. Cartwright at the conclu:: ion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously reported
unresolved items. The status of these items is discussed in the enclosed report.
During the inspection it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
Some corrective actions to prevent recurrence were completed
prior to the conclusion of this inspection; therefore your reply need only
address corrective steps taken or planned to insure that all equipment which
responds to Engineering Safeguards Feature actuation resets according to the
design criteria identified in your FSAR.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that3roprietary infor-
mation identified in the application is contained in a separ' te part of the
a
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
.
l8 0 0 8 010 09 3
- _
.- .
9
~
.
Virginia Electric and Power Company
-2-
'
s
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
.
Sincerely,
E.c.
R. C.
ewis, Acting Chief :
Reactor Operations and Nuclear
.
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-338/80-20
and 50-339/80-21
~
cc w/ enc 1:
W. R. Cartwright, Station Manager
Box 402
Mineral, VA 23117
,
P. G. Perry
Senior Resident Engineer
P. O. Box 38
Mineral, VA 23117
.
1
O*
b)*
,
, ww e - w .
.m
,
+ , - ~ + . -
---%-
-#
a. ., . ~ , - .
-#,,=e.
. . . . .