ML19326D974

From kanterella
Jump to navigation Jump to search
Revision to Tech Spec Change Request 61 Correcting Simplifying Assumption Made by B&W in Reanalysis of Cycle 3 That Allowed Utilization of Flux/Flow Ratio of rounded-off 1.04.Certificate of Svc & Affidavit Encl
ML19326D974
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/22/1980
From: Baynard P
FLORIDA POWER CORP.
To:
Shared Package
ML19326D975 List:
References
3-03-A-3, 3-3-A-3, NUDOCS 8007250326
Download: ML19326D974 (3)


Text

__

.V j.y';k?LJ ;ig 1;c,x;  :

& ff , ~pl Q% jf' w- ,

M Power CO M PO M A f EON July 22, 1980 File: 3-0-3-a-3 Director Office of Nuclear Reactor Regulation Division of Operat:.ig Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Technical Specification Change Request No. 61

Dear Sir:

Enclosed are three (3) originals and forty (40) copies of revised proposed pages to the Crystal River Unit 3 Technical Specifications. These revised pages correct a simplifying assumption made during Babcock & Wilcox re-analysis of Cycle 3, the results of which were transmitted to you in R.M. Bright's letter of April 30, 1980. The original Cycle 3 Reload Report (BAW-1607) was based on a thermal power level of 2544 n7t and included reactor coolant pump power monitors. These assumptions allcwed the utili-zation of a flux / flow ratio of 1.070. A revised analysis were based on a ratio 1.04 (1.044 rounded off). The reduction and operating flexibility resulting from this round off is unnecessary and undesirable.

It is, therefore, requested that Technical Specification Change Request No. 61 be modified to include the attached revised pages.

Also included is one (1) signed copy of the Certificate of Service for re-vision to Technical Specification Change Request No. 61 to the Chief Execu-tive of Citrus County, Florida, f Sincerely, FLORIDA POWER CORPORATION T*  %

P. Y. Baynard Manager Nuclear Support Services Baynard(Td)D3-1 Ggneral Office 3201 inirty-fourtn street soutn . P O Box 14042. St Petersburg, Florida 33733 813-866-5151 800725 34 y_.

- _ = - . .

M STATE OF FLORIDA

COUNTY OF PINELLAS f.

P. Y. Baynard states that she is the Manager, Nuclear Support Services Department of Florida Power Corporation; that she is authorized on the part of said company to sign and file with the Nuclear Regulatory Com-mission the information attached hereto; and that all such statements

! made and matters set forth therein are true and correct to the best of her knowledge, information and belief.

, Ar N. Y s . 2

  1. Pgl.Bafnafd' i

i Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 22nd day of July,1980.

(

l s

Y b( b itNotary n ! Public

$ Y m//b d

/

A Notary Public, State of Florida at Large, My Commission Expires: June 8, 1984 f PYB/MAHNotary(DN-98)

I

i 3

UNITED STATES OF AMERICA

-NUCLEAR REGULATORY COMMISSION i

IN THE MATTER OF )

) DOCKET NO. 50-302 FLORIDA POWER CORPORATION )

CERTIFICATE OF SERVICE P. Y. Baynard deposes and says onat the following has been served on the Chief Executive of Citrus County, ' Florida by deposit in the United States mail, addressed as follows:

Chairman, Board of County Commissioners of Citrus County Citrus County Courthouse Inverness, Florida 32650 j An original copy of the revision to Tehnical Specification Change Request, No. 61, requeeting amendment to Apperidix A of Operating License No. DPR-72.

l FLORIDA POWER CORPORATION A2 d

/P. YB BWnard / v l

L Manager

, Nuclear Support Services SWORN TO AND SUBSCRIBED BEFORE ME THIS 22nd DAY OF JULY,1980.

i

< Y )'Yd 1 / M 2 d h ~ l W l

( / Notary Public #

Notary Public State of Florida at Large

- My Commission expires: June 8, 1984 i

(NOTARIAL SEAL) i (Cert. Serv.D12)

1. :

- ~

Y w i -.9.,9--.w-p__ 99--.- rw= -weog s ,e+, . . g3 p.--..-yq-9..,,.7W -mpn-.y, .o _,m,,y 9 y9 ,y,-. y