Text
7A Jersey Central Power & Light Company
@k,< (f (')
Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 (201)455-8200 July 7, 1980 Mr. Boyce H. Grier, Director Office of Inspection and Enforcement Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 I. E.Bulletin 80-11 In accordance with the requirements of I._.
Bulletin No. 80-11, we have identified all masonry walls at Oyster Creek that are in proximity to or have attachments from safety related piping or equipment such that wall failure could affect a safety related system.
Attachment No. 1 lists each wall, the significant equipment associated with the wall where at least one safety related system may be affected by wall failure, and the priority that has been assigned for the purpose of scheduling the re-evaluation of the wall.
Priorities are based on a preliminary engineering review which includes such factors as the wall locations, type construction, physical appearance and the vulnerability and number of safety related equip-ment possibly affected. Our field inspections have revealed no cases of safety related piping attached to masonry walls.
Attachment No. 2 provides a description and schedule of our program to reevaluate the design adequacy of the walls.
JERSEY CENTRAL POWER S LIGIT COMPANY f$$f
. & By l e Ivan R. Fi oc Jr. Vice Pres' nt Sworn and subscribed to before me this 7M day of /M/ 1980. / c/ I 840de ML Notary Public BARifARA M. SMITH NOTARY PUkUC of Ntw JERSEY cc: Director .a <n Ap 4,na4 Office of Inspection and Enforcement j Division of Reactor Operation's Inspection Washington, D. C. 20555 8007250 3c[ Jersey Central Power & Light Company is a Member f the General Pubhc Utit es System
ATTACllMENT 1 Page 1 of 5 4 WALL-DRAWING RE-EVALUATION NO. REF. WALL LOCATION EQUIPMENT ASSOCIATION PRIORITY I BR'4511-6 Control Room Safety related control liigh North Wall' cabinets in proximity to decorative tile 2 Control Room Safety related control liigh South Wall cabinets in proximity to block wall. Control cabinet fire protection and display cabinets attached to wall 3 Control Room Same as No. 1 Iligh East Wall Fire Protection electrical equipment attached 4 Control Room Same as No. I liigh West Wall I 5 Observation Safety related control Low - Room enclosure cabinets in proximity (1978 Mod) South Wall to wall Observation Same as No. 5 Low 6 Room S.E. to N.W. f. 7 Observation Room Same as No. 5 Low o West Wall 8 BR 4511-6 Cable Tray Area Cables in proximity Low East Wall to wall. Small fire protection and lighting boxes attached 4 9 Vestibule No. 2 Cables in proximity to wall Low l (Computer Room) East Wall IIcalth Physics Cables in proximity to wall liigh 10 Office - North Wall
ATTACIBIENT 1 Page 2 of 5 WALL DRAWING RE-EVALUATION NO. REF. WALL LOCATION EQUIPMENT ASSOCIATION PRIORITY 11 BR 4511-6 Ilealth Physics Same as No. 10 liigh Office-South Wall llealth Physics Same as No. 10 liigh 12 Office-East Wall 13 Contaminated Same as No. 10 liigh clothing area (ll.P. Tech Office) South Wall 14 Contaminated Same as No. 10 liigh clothing area-East Wall Monitor 6 Change Same as No. 10 liigh 15 Room - South Wall 16 Control Room Safety related control Iligh Center Column cabinets in proximity block facing to wall 17 BR 4510-3 BattegrRoom Safety related rotary liigh (AGB) inverter cable South Wall mounted on wall. (West Section) Rotary inverter and panel in proximity to wall BattegrRoom "B" Batteries in proximity liigh 18 (AGB) West Wall to wall (South Section) Electric Tray Cables in proximity to wall liigh 19 Room - North Wall Electric Tray Same as 19 liigh 20 Room-East Wall O
ATTACilMENT 1 Page 3 of 5 WALL DRAWING RE-EVALUATION NO. REF. WALL LOCATION EQUIPMENT ASSOCIATION PRIORITY 21 BR 4510-3 480i Switchgear Wall in proximity to liigh Room-North Wall safety related switchgear. IIalon system attached 22 480V Switchgear Same as 21 liigh Room-Center Block Wall 480V Switchgear Same as 21 liigh 23 Room-South Block Wall 24 BR 2050-3 Turbine Building Emergency service water Medium North East stairwell piping G 125 VDC conduit West Wall in proximity to wall. Non-safety related conduit mounted on wall 25 BR 2051-4 Cable Spread Battery charger G other Low (1980 Room-West Wall safety equipment mounted reinforced) G in proximity to wall Cable Spread Same as 25 Same as 25 26 Room-West Section of North Wall 27 Cable Spread Room Same as 25 Same as 25 North-South Wall on column line 11 28 BR 2052-3 North East stairwell Cable in proximity to wall Medium from turbine Non-safety conduit mounted operating floo'r on wall West Wall 29 BR 2060-4 Reactor Building Containment spray pumps power Medium S/E stairwell to supply mounted on wall. -19'-6" North Wall Containment spray pumps and piping in proximity to wall. o 9
ATTACllMENT 1 Page 4 of S WALL DRAWING RE-EVALUATION NO. REF. WALL LOCATION EQUIPMENT ASSOCIATION PRIORITY .30 BR 2060-4 Reactor Building Same as 29 Medium S/E stairwell to -19'-6" -West Wall 31 BR 2060-4 Reactor Building Motor control center DC-1 Medium elevator 23'-6" in proximity to wall to 51'-3" West Wall Rx Building Stair-Motor control center DC-1 Medium 32 well 23'-6" in proximity to wall. Non to 51'3" safety IIVAC mounted on wall North Wall Rx Building stairwell MCC DC-1 in proximity to wall Medium 33 23'-6" to 51'3" West Wall 34 BR 3161 Office building Cables in proximity to wall Medium 3rd floor locker room-North wall 35 Shower Room Same as 34 Medium North Wall 36 Shower Room Same as 34 Medium West Wall 37 Toilet No. 4-North Same as 34 Medium Wall Toilet No. 4-South Same as 34 Medium 38 Wall Supervisors Shower Same as 34 Medium 39 North Wall ^ Supervisors Shower Same as 34 Medium 40 South Wall l
4 ATTACllM2NT 1 Page 5 of 5 WALL DRAWING RE-EVALUATION NO. REF. WALL LOCATION EQUIPMENT ASSOCIATION PRIORITY 41 BR 3161 Supervisors shower Cables in proximity to wall Medium East Wall 42 Corridor No. 5 Same as above Medium East Wall 43 BR 2061-4 Shutdown heat Safety related core spray liigh exchanger pressure switches and room-North Wall transducers and Rx 1cvel (Knockout Section) tubing _in proximity to wall. 2 o e 0 h O
ATTACilMENT 2 SCllEDULE FOR CONCRETE BLOCK WALL REEVALUATION OYSTER CREEK NUCLEAR GENERATING STATION MOMTil: JULY AUGUST SEPTEMBER OCTOBER NOVEMBER WEEK BEGINNING: 7 14 21 28 4 11 18 25 1 R 15 79 pr' 6 it 90 77 3 10 17 74 Plant survey to verify wall openings equipment support locations, visible wall defects (if any), etc. Preparation of detailed sketches showing wall elevation, openings, and equipment support locations, etc. Verification and preparation of applied loads on the wall Tabulation of applied loads for each wall Development of reevaluation criteria including the justification for its use Preliminary reevaluation of block walls Final reevaluation of block walls i Identification of non-conforming walls Preparation of report e}}