P TENNESSEE VALLEY AUTHORITY ct6tFdf6%?Ru^t Yt1%Y%de'r' fI

. July 18, 1980 Mr. Janes P. Reilly, Director Office of Inspe on and Enforcement U.S. Nuclear Regu tory Commission Region II - S' !.te 3 0 101 Marietta Street Atlanta, Georgia 3030

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - SAFETY INJECTION PUMP BREAKER LOCK 0UT -

NCR 27P - FIRST INTERE4 REPORT

  • he subject deficiency was initially reported to NRC-0IE Inspector M. Thonas on June 19, 1980, in accordance with 10 CFR 50.55(e).

Enclosed is our first interim report. We expect to submit our next written report by August 25, 1980.

If you have any questions concerning this natter, please get in touch with D. L. Lambert at FTS 357-2581.

Vev truly yours, TENNESSEE VALLEY AUTHORITI L. M. Mills, Manager Nuclear Regulation and Safety Enclosure j ec: Mr. Victor Stello, Jr., Director (Enclosure)V Office of Inspection and Enforcement U.S. Nuclear Regulatory Consnission Washington, DC 20555 i

l go/4 9iI

.R007230466 l An E::ual C2:criurity Emetover 4 l

. o ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2-SAFETY INJECTION PUMP BREAKER LOCKOUT 10 CFR 50.55(e)

NCR NO. 27P FIRST INTERIM REPORT Description of Deficiency

-During preoperational testing of Sequoyah unit.2 safety injection pumps _(2A-A and 23-B), it was found that if the pumps were given a closed (start) signal for greater than 0.32 seconds while a pump trip condition existed, the 6900V breakers would lock out, preventing pump start. There is no visual or audial indication to operations personnel when this lockout condition exists. The breaker appears to be available for service when it actually is not.

Corrective Action TVA is investigating this problem.