ML19326D554

From kanterella
Jump to navigation Jump to search
Ack Receipt of Util 770527 Final Deficiency Rept Re Component Cooling Water Pump Casings
ML19326D554
Person / Time
Site: Midland
Issue date: 06/06/1977
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8006180731
Download: ML19326D554 (1)


Text

__

-Q' (CENTRAL RLES n

n o

,t r

i l

\\

j j

JUN 619T7 Docket No. 50-329 Docket No. 50-330 p

Consumers Power Company

. ~,.........

ATI'N:

Mr. Stephen H. Howell,,,,

Vice President 1945 West Parnall Road Jackson, MI 49201 s

Gentiemen:

\\

Thank you for your final report dated. May 27, 1977, pursuant to 3

10 CFR 50.55(e) regarding component cooling water pump casings.

i We have no further questions,regarding this matter at,this time.

t Your cooperation with us is l'ppreciat_ed.

, Q'

~...

Sincerely,

\\

R. P. Heishnan, Chief

.i.\\

Reactor Construction and Engineering Support Branch ec w/1tr dtd 5/27/77:

s Central Files Reproduction Unit NRC 20b

, PDR

,g, Local PDR NS1C tic Ronald Callen, Michigan Pisbl,ic Service Comission Dr. Wayne E. North Myron M. Cherry, Chicago THIS DOCUMENT CONTAINS POOR QUAUTY PAGES 8006180

/

p p GD

^

RIII RIII or,,e s,

VandelIIs

-hayedO lleir i. n 6/2/77 oave

  • NRC PORM 313 (p.76) NRCM 0240 W u. s. eaves==usur,nanrine o,,,can tore -ese.es4 J.... }

n,

.,-..-~~--..n n ( ~ p

~~....,.... s -...

~

(.

()

E

. f :::N

/

p8"

CEU!illBIS i:

\\

';;.T

,' [ij Stephen H. Howell Vice l>ni. lent General Of fices: 1945 West Parnait Road, Jackson, Michigan 49201

  • Area Code 617 788 0453

.May 27, 1977 J owe-89-77 s

,i I

Office of Inspection and Enforcement

,Att: Mr 'J G Keppler, Regional Director Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND NUCLEAR FIANT - COMPONENT COOLING WATER CASINGS FINAL REIORT - DOCKET NOS 50-329 AID 50-330 On April 5,1977, per 10 CFR 50.55(e) we provided an interim report on the design of coc:ponent cooling water pump casings. This report is a final repcrt in that the corrective action and the safety implications of the correction have been determined.

It has been decided to cancel th'e procurement of these pumps from BfhW Canada Ltd.

A new purchase order will be plD.ced with another supplier.

There are no unresolved r afety implications associated with this corrective action because the new purchase order specifies component cooling water pumps which are in compliance with the Midland ISAR commitments.

l 4whG*

CC: Dr Ernst Volgenau (15)

Director, Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Mr William G Mcdonald Director, Office of Management Information and Program Control US Nuclear Regulatory Commission mHf311977 Washington, DC 20555 gc0 1

,