Notifies That Facility 740221 Operator Requalification Program Acceptable Subj to Incorporation of Encl Comments
ML19326D032
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/22/1974
From: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8004300654
Download: ML19326D032 (2)


Text

.

6A*'

  • O 4 3 o o CSy j

w

.-]

p

.- n A_

t,

- - w
-

~-ma.w

....-.-...w s

Docket lio. 50-313 MAR 2 2 Jgg i

Arkansas Power and Light Company ATTA: tir. J. D. Phillips Senior Vice President, Production, Transmission and THIS DOCUMENT CONTAINS Engineering POOR QUAL.lTY PAGES I

ssxch and Pine screet, l

Pine Bluff, Arkansas 71601 l

[

Centlemen:

Ue have reviewed the Arkansas nuclear One Operator Requalification Program, submitted on February 21, 1974. Based on our review we find f

the program acceptable for Unit 1 subject to incorporation or satisfaction of the comments listed below; the cocnents are referenced l

co the appropriate sections of the Arkansas nuclear One submittal.

IV.A.

The let paragraph should be revised to read "Each licensed

{

operator shall, during the term of his license, perform a ninimum of 10 reactivity control manipulations which f

deconstrate his skill and/or familiarity with reactivity I

control systems. Each licensed senior operator shall either nanipulate the controls or direct the activitics of others during 10 reactivity control r.anipulations.

These manipulations may consist of any of the following, but reasonable effort will be made to provide each operator a variety of changes".

t IV.A.1 This section should be revised to indicate the reactor control systen must be in manual.

l l

IV.A.2 A reactor startup must be to the point of adding heat.

V.B The last sentence should be revised to indicate that an I

operator or senior operator will be rescheduled for lecturcs f

in a more timely manner than "the next tire such lectures are scheduled".

With these changes your Operator Requalification Program will be acceptable for the staff of Unit 1 only. Unit 2, although a similar i

unit, is not identical to Unit 1, and the Atomic Energy Coccission vill L.b

1.,

(

m, t

J. D. Phillips MAR g g gy therefore require certain additional actions in initial qualificatica and requalification of operators for combined operations of the two I

units. Our requireinents in this regard will be clarified for you in the operating license review of Unit 2 which is just beginning. At an appropriate time in the future you should resubmit your Operator Requalification Program anended as necessary to apply to both units.

Sincerely, OdginaiSIR"*d A. Schwancer, Chief Light Water Reactors Er. 2-3 Directorate of Licensing ces: Horace Jewell House, Holms & Jewell 1550 Tower Building Little Rock, Arkansas 72201 Mr. William Cavanaugh, III Production Department i

P. O. Lox 551 Little Rock, Arkansas 72203 DISTRIBUTION:

AEC PDR Local PDR

)

Docket LWR 2-3 Rdg VAMoore DEisenhut ASchwencer RMBernero EIGoulbourne ACRS (16)

RWKlecker R0 (3) 5 extra eps f

PCollins l

THirons l

JJHolman t

i I

{

omer >

l.WR 1.~t

...L10R/.C

' LIC

.2=3.

d'-;/4

./c-l gg,]sg PFCollins ASc neer L

3/ n

../74, 3/.a. * /74 3/ f [,/74

-m.

[

ac.u.ia. m ocx ou.

m'

_