ML19326C943
| ML19326C943 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/21/1973 |
| From: | Collins P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8004290573 | |
| Download: ML19326C943 (2) | |
Text
.-
, er.
\\
V f.
w,R2119D Arkansas Power & Light Company ATII: Mr. Willi - Cavanaugh III THIS DOCUMENT CONTAINS Production Depadment P. O. Box 551 P0OR QUAUTY PAGES Little Rock, Arkansas 72203 Gentleman:
This letter is in reply to your request that we determine a schedule for operator and senior operator examinations for Arkansas Euclear One-Unit 1.
Prior to the administration of cold =raminations at a facility, we must be assured that the facility control mechanisms and instru-mentation are in such condition to permit the effective edminis-tration of a stun 1sted operating test, that the facility license review is essentially complated, including determination of the technical specific &tions, and that we have received the facility's normal and emergency operating procedures.
Enclosed is a listing of procedures that are normally submitted to this office in order for us to properly prepare the esaminations.
We realize that some of the procedures may not be applicable to your facility and that your procedure titles may not be the same as listed. Also, you probably win have procedures that are not contained in the enelnaad listing, such as administrative procedures that define the authorities and responsibilities of licensed operators and senior operators during normal, abnormal and emergency conditions.
Any such y.h that pertain to the duties and responsibilities of licensed personnel shoubt also be submitted.
Based on the Arkansas Nuelmar One-Unit 1 fuel loading date, November 1, l
1973, we suggest the following time sequence for the administration of the cold numminations. If the feel leng date changes appreciably, j
the schedule will be revised.
DATE Amvm Eight weeks prior to the admin-Receipt by the Operator Licensing istration of written exami-Branch of all applications and all nations (July 12,1973) operating, emergency and applicable administrative procedures.
8 0 0 4 290 $~'7 3 bl
q,~
-___.m c
I
- s DISTRIEUTION:
1.t Branch Reading File Facility File 2-RJ3nrsey DATE ACTIVITf Six t.o eight weeks prior to fuel
>A=iniet, ration of the operator loading (Sept. 6-20) and senior operator written aw==inations.
Two to four weeks prior to fuel Administration of the " cold" loading (Oct. 4-18) operating tests.
One week, prior to fuel loading Notification of final evnmi-(Oct. 25,1973) nation n sults and issuance of licenses.
'!be above schedules will provide time for preparing the er==1 nations, grading the written ermainations and evaluating results of the " cold" operating tests so that successful applicants will receive licenses prior to the beginning of the core 195n=. operation.
Administration of these avaminations have been assigned to Mr. George Mans, Headquarters wr==inee.
Mr. Hans's telephone ni=har is 301-973-74T6.
Details regarding the schedula and ad=intatration of the swamination should be discussed with him.
We suggest you; submit resumes at this time for the individuals who vill be applying for cold erwinations. We will review them to assure that l
each individual meets eligibility requirements pursuant to Section 55 25 (b) i of 10 CFR Part 55 I hope this information will be of use to you.
Sincerely, OR$1NAL stGNEQ BY i
P. F. ocLLINS Paul F. Cn11 tna, Chief Operator Licensing Branch Directorate of Licensing
Enclosure:
PWR Procedun Listing i
0.LBIL
_o o rier,
RJBurseffdif..
PFCollins..
sv.~.u,,
J 3/b /73 3M'/73_
o.rt.
v.
ac.m a.
..,n neum