ML19326C274
| ML19326C274 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/13/1973 |
| From: | Schwencer A US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8004220837 | |
| Download: ML19326C274 (2) | |
Text
__
r=
=
u
!.i...
[f.,..
E6 b
DISTRIBUTION hocket f
- =
PWR-4 Rdg
[
~
RP Rdg g
SEP 13 573 L Rdg
!?
RCDeYoung b-22.
iDockst Ko". 50-313 JHendrie is AKenneke p.
RWKlecker OGC Arkansas Power & Light Company R0 (4)
ATIN:
Mr. J. D. Phillips RMBernero
[.'
Vice President &
EIGoulbourne i
Chief Engineer Dross Sixth & Pine Streets ASchwencer
Gentlemen:
E 22:
On August 30, 1973, we met with your representative and Babcock & Wilcox staff nerbers to discuss your proposed special loading procedures for
~
those portions of your initial fuel load for Arkansas Nuclear One, Unit 1 which contain resintered pellets. At that meeting, we indicated the conceptual acceptability of your proposal but stated that we would need additional information to conclude our evaluation of this matter.
The additional information we require is listed in the enclosure to this
~
Ictter. In order to conclude our review in an orderly fashion with consideration of the schedules of our other work and your proposed fuel load schedule, we require your response to these requests by October 23, 1973.
Sincerely,
'l Original Si.cw! by
/]j Albert Schwencer A. Schwencer, Chief Pressurized Water Reactors Branch No. 4 Directorate of Licensing
Enclosure:
Request for Additional Information ec: Horace Jewell Mr. William Cavanaugh, III Eouse, Holna & Jewell Production Department
.:q 1550 Tower Building P. O. Box 551 Littic Rock, Arkansas 72201 Little Rock, Arkansas 72203 q
l
...... L..: C.;/.CPBr
/PWR.4
................l l
L:
......P. WR-4 oma,
- g...
sunntwr > 3.@.ef.nc.rc :%,,,,,, Dross yp 0 AyR0_hJD A chwencer I
om l.9../.../.2... / 7 3..! 9../.....,...... _ /73 9/...I. v................................,,,
/73 Fcrm MC tin dev. 9 5U Atot ono ses
.a i-te - gi,w t.:. s
.t
~
,..$'-w
~
p e
REQUEST FOR ADUITIONAL INFORMATION 1.
Describe the dimensional changes produced in the fuel pellets which were resintered including:
(a) Describe the sampling method, (b) describe the method of data reduction including statistical analysis techniques.
(c) provide the dimensional data for the resintered pellets.
2.
Provide the method and bases of your classification of pellets, rods and fuel assemblies with respect to limiting heat generation rate.-
Include consideration of fuel melting and LOCA limit at the minitmim.
3.
Provide the power distribution data illustrating the loadings which can accomodate lower rated fuel assemblies for three fuel cycles.
Discuss the effects of reduced burn-up on fuel assemblies which are successively loaded into lower flux regions of the core.
4.
Describe what measures have b'een taken and will be taken to correct loading of these fuel pellets, rods and assemblies.
I l
t i
I
_