Requests re-evaluation of Security Plan Per Reg Guide 1.17 W/Amends to Plan or Revised Plan If Necessary.Info Provided Should Include Best Estimate of Date of Amends or Revised Plan Implementation
ML19326C245
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/25/1974
From: Schwencer A
US ATOMIC ENERGY COMMISSION (AEC)
To: Phillips J
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8004220817
Download: ML19326C245 (2)


Text

- - - -

.=..

l....

s.

-a r

, mer

r==

- : =-

G: ( ) N::

iN.

=

=:::; ;;

r.

.... =,

=

z.-

p=

r..:;;;

NAR 2 5 1974

. _.==

.W::

Docket No. 50-313 cs; Arkansas Power and Light Company ATTN: lir. J. D. Phillips Senior Vice President, 2=

=

Production, Transnission and Engineering Sixth and Pine Streets Pine 151uf t, Arkansao 71601 Gentlemen:

In June 1973, the Connission published Regulatory Guide 1.17, " Protection of I'uclear Power Planta Against Industrial Sabotage", and on l'oT mber 6, O

1973, adopted anendments to its regulations in 10 CFR Parts 50, 70 and 73 f9 to strengthen the physical protection of plants and materials. The new L

rules required, in part, that licensees authorized to operate production and utilization facilities subnit a physical security plan to the Cote:ission by January 7,1974, if such a plan, as described in the nev 10 CFR 50.34(c),

had not been submitted by : ovember 6,1973.

Although the docket record for your facility reficcts subnittal and review by the staff of a security plan, ve consider it necessary at this time

-i=

that you re-evaluate your security plan with respect to the regulations and the regulatory position set forth in Regulatory Guide 1.17.' The staff conciders that all nucler.r pcuer plants licenced pursuant to 10 CFR 50 should have or upgrade, if necessary, physical security plans to conform at nininun, with this regulatory position.

I' You are asked, therefore, to cubnit within 30 days of receipt of this ictter, the results of your re-evaluation, which should include, if neccesary, anondments to your security plan on the docket record, or a revised plan, in sufficient detail to pomit the staff to deternine ito confornance with Regulatory Guide 1.17.

The infornation to be subnitted 1 :-

should also provide best octirates of the date or dates when inplenentation in expected.

If any of these dates extend beyond June 15, 1974, the infomation provided should include a daccription of interin neasurcs to be taken to provide cc pencating protection for such tecporary periods. Uc do not concider conduct of this review and inplenentation i

of attendant revisions ns controlling the licencing schedule for Unit 1, but vill req': ira that you act prouptly in this natter.

&PPl 6 18 0.0 4 22 0[/Q

j pps,.._,

= ::.

(.=-

p

. p gm

~

~-

Mr..J. D. Phillips MAR 2 5 1374

=

=:: 5

~

Three copics of your response should be subnitted. Your letter of transnittal should request that details of your security plan be withheld froci public disclosure pursuant to Section 2.790 of 10 CFR Part 2.

Sincerely, p:

Original Signed 9

A. Schwencer, Chief

.-1,I Light Vater Reactors Br. 2-3 Directorate of Licensing ccs: l'orace Jewell EE House, Holna & Jcuell 1550 Tower Building Littic Pock, Arkansas 72201 g_,

Mr. Uillian Cavanaugh, III

.c._

Production Department P. O. Box 551 Little Rock, Arkansas 72203 DISTRIBUTION t

I'

)

AEC PDR Iocal PDR g

Docket

.g, LWR 2-3 Rdg VAMoore DEisenhut ASchwencer Y

RMBernero EIGoulbourne ACRS (16)

RWKlecker RO (3) 5 extra cps

[

FAllenspach

.l THirons RWHouston le 2.-- 1

.....LiC/.On

.L alR. 2=3.

.. Lg%R......

omet >

RWIfous;tonnj.%r'

'/

A RMBernero:knf AS h'encer

$URNA4E >

......t f

,,,,g,,f,/7q 3/,g,{,,,/74,, 3/,,g,,[

/70 3/

cart e.

roem Ate-3 s (Rev 9-53) AECM 0240 g,,,,,,,,og,

,,,,,n,,,,,,, gg,

,,3 3g, g

'i g

-