Table 4.2-1 Capsule Assembly Withdrawal Schedule (l)
First capsule Has been withdrawn for testing Second capsule Following the 1st cycle at Davis Besse 1 withdraw 1 base metal capsule Third capsule To be withdrawn at the time when the capsule's accumulated neutron fluence (E) 1 Mev) corre-sponds to that at 1/4 of the reactor vessel wall location at approximately the end of the vessel's design service life.
Fourth capsule To be withdrawn at the time when the capsule's accumulated neutron fluence (E) 1 Mev) corresponds to that at the reactor vessel wall location at approximately the end of vessel's design service life.
Fifth capsule To be inserted following the 3rd cycle at Davis Besse 1 for standby use.
(1)
Withdrawal schedules may be modified to coincide with those refueling outages or plant shutdowns, when the reactor head is removed, of Davis Besse 1 most closely approaching the above withdrawal schedule.