Tech Specs Table 4.2-1 Re Reactor Vessel Surveillance Assembly Withdrawal Schedule
ML19326C168
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/13/1977
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19326C163 List:
References
NUDOCS 8004210664
Download: ML19326C168 (1)


Text

- . ._

R. y

,0 -

Table 4.2-1 Capsule Assembly Withdrawal Schedule (l)

First capsule Has been withdrawn for testing Second capsule Following the 1st cycle at Davis Besse 1 withdraw 1 base metal capsule Third capsule To be withdrawn at the time when the capsule's accumulated neutron fluence (E) 1 Mev) corre-sponds to that at 1/4 of the reactor vessel wall location at approximately the end of the vessel's design service life.

Fourth capsule To be withdrawn at the time when the capsule's accumulated neutron fluence (E) 1 Mev) corresponds to that at the reactor vessel wall location at approximately the end of vessel's design service life. -

Fifth capsule To be inserted following the 3rd cycle at Davis Besse 1 for standby use.

(1)

Withdrawal schedules may be modified to coincide with those refueling outages or plant shutdowns, when the reactor head is removed, of Davis Besse 1 most closely approaching the above withdrawal schedule.

1 77b 8004210

.