ML19326C111

From kanterella
Jump to navigation Jump to search
Forwards RO 50-313/76-19
ML19326C111
Person / Time
Site: Arkansas Nuclear 
Issue date: 08/11/1976
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: Howard E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19326C112 List:
References
NUDOCS 8004180770
Download: ML19326C111 (1)


Text

^

y,

==, g f

')

E W4 COW H ELPIN G BLJILO A R ot A N S A S

\\

/

%d ARK ANS AS POWER & LIGHT COMPANY STM & LOUISIANA STAEETS. LITTLE ACCK. AAK ANSAS 72203.(5013372-4311 August 11, 1976 A

8 q

OfCf y(0 e i Mr. E. Morris Howard, nirector

~/8 I

Office of Inspection 6 Enforcement

Neseau,

~

e Region IV p

]

U. S. Nuclear Regulatory Commission e#

s v

611 Ryan Plaza Drive, Suite 1000

,/

Arlington, Texas 76012 N ;OL.

Subj ect: Arkansas Power 6 Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51

- Reportable Occurrence No. 50-313/76-19 Gentlemen:

In accordance with Technical Specification 6.12.3.2 we have attached

~

the subject report concerning the failure to perform surveillance test on the control room emergency ventilation system at the required frequency.

Very truly yours,

/ ch s

Donald A. Rueter Manager, Licensing 1

DAR:ay

^1 Attachment cc: Mr. W. D. MacDonald, Director Office of Management Information

/

and Progrcm Control COPY SENT REGIO U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. E. Volgenau, Director Office of Inspection 4 Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 3

0

~

9=TW g

I g004180770 f

,