ML19326B984
| ML19326B984 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/16/1968 |
| From: | Morris P US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| References | |
| NUDOCS 8004180682 | |
| Download: ML19326B984 (1) | |
Text
.
/
Distribution:
Pub Doc Em Formal DEL Reading
.h R m Reading SEP 161968 RP3-3 Reading a^
Docket No.
50-313 Supple.
P. A. Morris F. Schroeder R. S. Doyd S. Levine C. G. Long Arkansas Power & Light Company F. W. Karas (2)
Sixth and Pine Streets L. Kornblith, ORNL Pine Bluff, Arkansas 7160L T. Engelhardt CGC Attention: Mr. J. D. Phillips F. Nolan Vice Pasident & Chief Engineer P. S. Check A. Schwencer Gentlemen:
R. Engelken In reply to your July 3,1968 request on behalf of the Arkansas Power & Light Company for withholding Appendix J of Supplement No. 5 of the Pmliminary Safety Analysis Report from public disclosure pursuant to Section 2 790 of 10 CPR Part 2, ve have determined that disclosure of the contents of Appendix J is not required in the public interest nor by 10 CFR Part 9 and would adversely affect the interest of Arkansas Power & Light Cocrpany. Accordingly, Appendix J is being withhald from public inspection pursusnt to Section 2 790 of 10 CPR Part 2.
Withholding of Appendix J from public inspectio.1 shall not, however, affect the right, if any, of persons properly and directly concerned to inspect it.
Sincerely yours, Original Signed by Peter A, Morris Peter A. Morris, Director Division of Reactor Licensing cc:
Messrs Harlan T. Holmes Horace Jewell Roy B. Snapp b
/
udker s o0418o4B"1 O
.E3.3/;RL
,RP3.-3/DRL OGG RP/DRL DRL omer >
k suner >
A.qh.w.e.ncer.;.pt C _ go.:6 g
RSBoyd PAMor s om,
.9. PL 68 _.. 9.-/b68 9 S -68
_ _9-
-68 9-// -68 r= =-=m
- a u -- _,_