ML19326B559
| ML19326B559 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/19/1976 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19326B561 | List: |
| References | |
| NUDOCS 8004160344 | |
| Download: ML19326B559 (2) | |
See also: IR 05000313/1976004
Text
4 . . - '~
- '&
k
.
UNITED STATES
\\v
NUCLEAR REGULATORY COMMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
611 RYAN PLAZA ORIVE SusTE 1000
ARLINGTON TEXAS 76012
D
,
to a
1
y
.
Arkansas Power and Light Company
Docket No. 50-313
ATTN: Mr. J. D. Phillips
Senior Vice President
Sixth and Pine Streets
Pine Bluff, Arkansas 71601
.
Gentlemen:
4
This refers to the inspection conducted by 31aine Murray of this office
on March 3-4, 1976 of activities authorized by NRC operating License
No. DPR-51, and to the discussion of the inspection findians held by
Mr. Murray with Mr. J. U. Anderson, Jr. and other members of his staff
at the conclusion of the inspection on March 4,1976.
Nv)
Areas examined during the inspection and our findings are discussed in
th% enclosed inspection report. Within these areas, the inspection con-
sisted of selective examination of procedures and reprecentative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of nonco=plianc2 were
disclosed.
In accordanca with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
~
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
this office requesting that such information be withheld from public
disclosure.
If no propriatary infor=2 tion is identified, a written
statement to that effect should be submitted.
If an application is
i
submitted, it must fully identify the bases for which infomation is
i
claimed to be proprietary. The application should be prepared so thar
l
information sougnt to be withheld is incorporated in a ceparnte paper and
1
.
i
o
.
[
8 0 0 416 0.JPf/
.
--
,
. - - .-
- - _ .
, , .
,,--r,,
-- - -
w.
-
,
.
.
..
. .
.
.
.
3k'"3 " k
'O*]p D
m
y IJ, g
ap
g
.
Arkansas Power and Light
-2-
March 19, 1976
Company
f
referenced in the application since the application will be placed in
the Public Document Room. Your application, or written statenent, should
be submitted to us within 20 days.
If we are not contacted as specified,
'
the enclosed report and this letter may then be placed in the Public
Document Room.
'
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
'
Sincerely,
4
,
-
i
hM
,
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
\\
E.11osure:
IE Inspection Report NJ. 50-313/76-04
I
I
O
.
T
e
9
-
- . - -
-
. - . - -
.
.
-.