ML19326B459
| ML19326B459 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 02/08/1977 |
| From: | Rueter D ARKANSAS POWER & LIGHT CO. |
| To: | Howard E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19326B460 | List: |
| References | |
| 1-027-3, 1-27-3, NUDOCS 8004150806 | |
| Download: ML19326B459 (1) | |
Text
.
,m e
t' e
R
.' f
\\
H EL PIN G BUILO ARKANSAS V
ntRuaoa ARK ANS AS POWER & LIGHT COMPANY A Q. BOX SS1 UTTLE ACCK. 4.AK ANS AS 72203 130M 371 -4000 February 8, 1977
: *j ;
Q 1-027-3
) 't Mr. E. Morris Howard, Director Office of Inspection 6 Enforcement
- ~g.
$@ g<,-
Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
. Q,"
Arlington, Texas 76011 f
Subject:
Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Reportable Occurrence Report (n)
No. 50-313/77-2 v'
(File:
0520)
Gentlemen:
In accordance with Technical Specification 6.12.3.2, we have attached the subject report conceming a leak at a weld in the resin transfer l
l line for the Spent Fuel demineralizer.
Should additional information be needed, please advise.
Ve y t ly yours,
)
.l
(,
/* cf.w Donald A. Rueter Manager, Licen n t
DAR:BI:tw Attachment cc: Mr. W. D. MacDonald, Director Office of Management Information and Program Control G i-
[m\\_,}
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8004150 gob Dr. E. Volgenau, Director Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 s.
Y AX A AYING, 4NVESTO A OWNE D MEMBE A MIDQLE SOUTH UTILITIES SYSTEM