ML19326B352
| ML19326B352 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/27/1973 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19326B348 | List: |
| References | |
| NUDOCS 8004150729 | |
| Download: ML19326B352 (1) | |
Text
-.
r f
F\\
'( d J b.\\ '-O N. C. Moseley
~
_FS&EB ACTION C2:T20L FORM A.
Action Code CDR#144 Name of Licensee and 'acility Arkansas Pwr & Light (Arka sas Nuclear One-Docket No. or License No.
50-313 Title CDR Evaluation and Followup Origin _ CDR Date Rec'd 7/9/73 & 7/16/73 B.
FS&EB Branch Coordinator:
Bryan Dreher Ellis Paulus X
Complet/on Requested by
]
C.
Action Requested of:
I ADREMP M&PPOB EPB RPB ADC0 OB CB TAB 00E Region II l
Date Requested 7/27/73 Completion Requested by Reference Letter dated 6/15/73 from J. D. Phillips to F. E. Kruesi (received in HQ on 7/9/73) and ler dtd 7/16/73 from Phillips to Kruesi D.. Action Requested In accordance with PI 0600/6, " Construction Deficiency Reporting", the Arkansas Power & Light Company'(Arkansas Nuclear One - Unit 1) deficiency report of 6/15/73 and 7/16/73 covering deformed metal over cap screws on the main fuel handlitig bridge is being assigned to Region II for evalua-tion of the technical adequacy of the corrective action and the final resolution of the deficiency.
E.
Date Action Completed Close-out (Date & Method)
Comments:
If completion date is not consistent with your work schedule, please.let us know.
~
~
w i
. G.. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations O
8004150 72 9
~
==
m 4
,-w
,.,wr-
-,-,pa
--,------------y
- - -, -