ML19326B352

From kanterella
Jump to navigation Jump to search
Action Control Form Requests Review of Util 730615 & 0716 Deficiency Repts Re Deformed Metal Over Cap Screws on Main Fuel Handling Bridge
ML19326B352
Person / Time
Site: Arkansas Nuclear 
Issue date: 07/27/1973
From: Jennifer Davis
US ATOMIC ENERGY COMMISSION (AEC)
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19326B348 List:
References
NUDOCS 8004150729
Download: ML19326B352 (1)


Text

-.

r f

F\\

'( d J b.\\ '-O N. C. Moseley

~

_FS&EB ACTION C2:T20L FORM A.

Action Code CDR#144 Name of Licensee and 'acility Arkansas Pwr & Light (Arka sas Nuclear One-Docket No. or License No.

50-313 Title CDR Evaluation and Followup Origin _ CDR Date Rec'd 7/9/73 & 7/16/73 B.

FS&EB Branch Coordinator:

Bryan Dreher Ellis Paulus X

Complet/on Requested by

]

C.

Action Requested of:

I ADREMP M&PPOB EPB RPB ADC0 OB CB TAB 00E Region II l

Date Requested 7/27/73 Completion Requested by Reference Letter dated 6/15/73 from J. D. Phillips to F. E. Kruesi (received in HQ on 7/9/73) and ler dtd 7/16/73 from Phillips to Kruesi D.. Action Requested In accordance with PI 0600/6, " Construction Deficiency Reporting", the Arkansas Power & Light Company'(Arkansas Nuclear One - Unit 1) deficiency report of 6/15/73 and 7/16/73 covering deformed metal over cap screws on the main fuel handlitig bridge is being assigned to Region II for evalua-tion of the technical adequacy of the corrective action and the final resolution of the deficiency.

E.

Date Action Completed Close-out (Date & Method)

Comments:

If completion date is not consistent with your work schedule, please.let us know.

~

~

w i

. G.. Davis, Deputy Director for Field Operations Directorate of Regulatory Operations O

8004150 72 9

~

==

m 4

,-w

,.,wr-

-,-,pa

--,------------y

- - -, -