ML19326B339
Jump to navigation
Jump to search
| ML19326B339 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear, Crystal River, Maine Yankee, Rancho Seco, Crane |
| Issue date: | 06/19/1974 |
| From: | Thornburg H US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Brunner E, Murphy C, Seidle W, Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML19326B340 | List: |
| References | |
| NUDOCS 8004150719 | |
| Download: ML19326B339 (1) | |
Text
. _ _ _ _ _ _.
s i
/,
}{ i @
./
eg UNITED STATES h
TOMIC ENERGY COMMISSION
'5b l WASHINGTON. D.C. 20545
,,,,,,,, /
u N 19 U74 E. J. Brunner, RO:I W. C. Seidle, RO:II C. E. Murphy, RO:II G. S. Spencer, RO:V FLOW ORIFICE DESIGN DEFICIENCY Enclosed for your information and possible action are copies of
'I CDR#247 and an evaluation memorandum prepared by TAB concerning the subject deficiency.
d We concur in TAB's recommendation that RO inspection attention be provided to assure orifice replacement at the affected facilities.
)
i ffh LLS' C
l' D 1arold D.(Thornburg, Chief Field Support & Enforcement Bran Directorate of Regulatory Operations CP
~a 800415071f 3
,gT5'N V QO'313)