ML19326A548
| ML19326A548 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/05/1972 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Sampson G TOLEDO EDISON CO. |
| Shared Package | |
| ML19326A550 | List: |
| References | |
| NUDOCS 8002040718 | |
| Download: ML19326A548 (1) | |
Text
- _ - -
/)L duk/ 4 u2.
r%
g UNITED STATE 3 1.l j.
ATOMIC ENERGY COMMISSION OIRECTORATE OF REGULATORY OPERATIONS REGION 8 81 ris 799 ROOSEVELT ROAO ymg GLEN ELLYN. ILLINOIS Got37 012) e54-2660 Septcaber 5, 1972 Toledo Edison Company Docket No. 50-346
~
AITN Mr. Glena J. Sampson Vice President Power 420 Madison Avenue Toledo, Ohio 43601 Gentlement Thank you for your letter dated July 28, 1972, in response to our letter dated June 29, 1972, inforning us of your plans to assure that valves important to nuclear safety do not have wall thicknesces below the minimum requirements specified by the applicable codes, standards, and procurement specifications. We have reviewed the plans outlined in your letter and we have no further questions at this cine. We will I
examino the implementation of your plans relative to this matter during future inspections of your activities.
Your cooperation with us is appreciated.
Sincerely yours, Eoyce 2. Crier Regional Director bec w/1tr dtd 7-28-72.
J. 3. Henderson, R0 R. H. Engelken, R0 H. D. Thornburg, R0 l
G. W. Reinmuth, R0 P. A. Morris, RO A. Giambusso, L R0 Files DR Central Files PDR Local PDR NSIC DTIE l
OGC, Beth, P-506A r
i l
l l
~
8oo2o401\\$
__