ML19326A500

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 76-01,Crane Hoist Control-Circuit Mods. Action Required.W/O Encl
ML19326A500
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/29/1976
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8002040684
Download: ML19326A500 (1)


Text

-

3

~ ' '

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION lit 799 ROOSEVELT ACAD GLEN ELLYN, ILLINOIS 60137 I

JUL 29 1976 l

Toledo Edison Company Docket No. 50-346 ATTN: Mr. Lowell Roe, Vice President Facilitas Development i

Edison Plaze l

300 Madison Avenue

]

Toledo, Ohio 43652 I

Gentlemen:

The enclosed Circular, No. 76-01, is forwarded to you for I

information and action. This is the first issue of an expanded system for ce===4 ration from the Office of 1

Inspection and Enforcement to applicants and licensees, to suppimaant the issuance of IE Bulletins.

Bulletins have been, and will continue to be, limited to subjects considered to be of appropriate significance to require prompt response. Circulars will cover subjects of 1 esser significance or 4 - adiary for which a longer response time appears appropriate. Circular No. 76-01 contains the same subject matter as Bulletin No. 76-07, which is being issued concurrently. If you are also the holder of a 3RC Operating License, you will also receive a copy of Bulletin No. 76-07 which will require a separate response. The only difference between the two documents is the time allowed for response. Future IE Circulars ay ba addressed to any class of NBC licensees, and may or may not require response.

Sincerely, James G. Keppler Regional Director bec w/ enc 1:

Encime:

Central Files IE h ecular No. 76 01 IE Files Reproduction Unit h1C 20b PDR Local PDR urg y

e, NSIC e

C TIC d

M S U. Young Park, Power i

j Siting Commission so02o4os,si p /= = ; m p.o.

W

-