Forwards IE Insp Rept 50-346/76-22 on 761028-29 & 1116-19. No Noncompliance Noted
ML19326A366
Person / Time
Site: Davis Besse 
Issue date: 12/16/1976
From: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19326A367 List:
References
NUDOCS 8002030175
Download: ML19326A366 (2)


See also: IR 05000346/1976022

Text

- - _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

__

-.

&f'

UNITED STATES

NUCLEAR REGULATORY COMMIS510N

.

REGION lit

799 ROOSEVELT RO AD

GLEN ELLYN. ILLINOIS 60137

DEC 161976

Toledo Edison Company

Docket No. 50-346

ATTN: Mr. lovell E. Roe

Vice President

Facilities Development

Edison Plass

300 Madison Avenue

Toledo, Ohio 43652

Gentlemen:

This refers to the inspection conducted by Messrs. A. G. Januska

and W. B. Grant of this office on October 28 and 29, November 16-19,

1976, of activities at Davis-Besse Nucluar Power Station, Unit 1

authorized by NRC Construction Famit No. CPPR-80 and to the dis-

-

cussion of our findings with Messrs. Green, Briden and Geddes at

the conclusion of the inspection.

..

The enclosed copy of our inspection report identifies areas

examinea during the inspection. Within these areas, the

inspection consisted of a selective ar==ination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were iden-

tified during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federcl Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains inforsation that you or your contractors

believe to be proprietary, you must apply in writing to this

,,

office, within twenty days of your receipt of this letter, to

'

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

o JTio

u

O (N+ 3

8oos030117

%.se

-

-

. . _

____.

__

__

_

_

.

Toledo Edison

-2-

0EC 161976

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely yours,

James M. Allan, Chief

Fuel Facility and

Materials Safety Branch

<

Enclosure:

IE Inspection Report

i;o. 050-346/76-22

,

cc w/ enc 1:

Central Files

\\ Raproduction Unit NRC 20b

PDR

Local PDR

O

NSIC

TIC

U. Young Park, Power

Siting Commaission