Forwards IE Insp Rept 50-346/76-23 on 761102-05,26-27,30 & 1201-02.No Noncompliance Noted
ML19326A363
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/28/1976
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19326A364 List:
References
NUDOCS 8002030173
Download: ML19326A363 (2)


See also: IR 05000346/1976023

Text

i

\\

.

.

FM GU

.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

-

REGION lit

799 ROOSEVELT RO AC

GLEN ELLYN. ILLINOt5 60137

DTC 2 81976

Toledo Edison Company

Dockst No. 50-346

ATIN: Mr. Lowell E. Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

<

Toledo, Ohio 43652

Gentlemen:

-

This refers to the inspection conducted by Messrs. R. D. Martin,

W. D. Shafer, P. H. Johnson, T. L. Harpater and R. C. Knop

of this office on November 2-5, 26, 27, 30 and December 1-2, 1976,

of activities at Davis-Besse, Unit 1 Construction Site authorized

by NBC Construction Permit No. CPFR-80 and to the discussion of

our findings with you and members of your staff at the senclusion

of the inspection.

The enclosed copy of our inspection report identifies areas

===4aad during the inspection. Within these areas, the

inspection consisted of a selective ===4== tion of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NBC requirements were identified

during the course of this inspectisc.

. . .

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

_

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except se follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an anelosure to the application.

loWTso+%

8 0 0 2 0 30\\T5

l

3

l

T9

g

!

k

/

  1. 776 19N

.

_

-

-

-

-

.

.

Toledo maison Co=pany

-2-

ITEC 2 81976

Um will gladly discuss any questions you have concerning this

inspection.

Sincerely yours,

Gaston Fiorelli, Chief

Emactor Operations and

Nuclear Support Branch

,

Enclosure:

.

IE Inspection Report

No. 050-346/76-23

cc w/ enc 1:

Central Files

Emproduction Unit NRC 20b

FDR

Incal FDR

MSIC

TIC

U. Young Park, Power

Siting Commission

...

-

--

- - --,