ML19326A363
| ML19326A363 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/28/1976 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19326A364 | List: |
| References | |
| NUDOCS 8002030173 | |
| Download: ML19326A363 (2) | |
See also: IR 05000346/1976023
Text
i
\\
.
.
FM GU
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
-
REGION lit
GLEN ELLYN. ILLINOt5 60137
DTC 2 81976
Toledo Edison Company
Dockst No. 50-346
ATIN: Mr. Lowell E. Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
<
Toledo, Ohio 43652
Gentlemen:
-
This refers to the inspection conducted by Messrs. R. D. Martin,
W. D. Shafer, P. H. Johnson, T. L. Harpater and R. C. Knop
of this office on November 2-5, 26, 27, 30 and December 1-2, 1976,
of activities at Davis-Besse, Unit 1 Construction Site authorized
by NBC Construction Permit No. CPFR-80 and to the discussion of
our findings with you and members of your staff at the senclusion
of the inspection.
The enclosed copy of our inspection report identifies areas
===4aad during the inspection. Within these areas, the
inspection consisted of a selective ===4== tion of procedures
and representative records, observations, and interviews with
personnel.
No items of noncompliance with NBC requirements were identified
during the course of this inspectisc.
. . .
In accordance with Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
_
copy of this letter and the enclosed inspection report will
be placed in the NRC's Public Document Room, except se follows.
If this report contains information that you or your contractors
believe to be proprietary, you must apply in writing to this
office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The
application must include a full statement of the reasons for
which the information is considered proprietary, and should be
prepared so that proprietary information identified in the
application is contained in an anelosure to the application.
loWTso+%
8 0 0 2 0 30\\T5
l
3
l
T9
g
!
k
/
- 776 19N
.
_
-
-
-
-
.
.
Toledo maison Co=pany
-2-
ITEC 2 81976
Um will gladly discuss any questions you have concerning this
inspection.
Sincerely yours,
Gaston Fiorelli, Chief
Emactor Operations and
Nuclear Support Branch
,
Enclosure:
.
IE Inspection Report
No. 050-346/76-23
cc w/ enc 1:
Central Files
Emproduction Unit NRC 20b
FDR
Incal FDR
MSIC
U. Young Park, Power
Siting Commission
...
-
--
- - --,