ML19326A361

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/76-24 on 761213 & 28-30. No Noncompliance Noted
ML19326A361
Person / Time
Site: Davis Besse 
Issue date: 01/11/1977
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19326A362 List:
References
NUDOCS 8002030172
Download: ML19326A361 (2)


See also: IR 05000346/1976024

Text

-

_-- _ _ _ -

- - _ --

'

,

e

.,6

.

.

,

.

.

S

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION lli

799 ROOSEVELT ROAO

GLEN ELLYN. ILLINOIS $0137

'

JAN 111977 YgW

Toledo Edison Company

Docket No. 50-346

ATTN: Mr. Lowell Boe

Vice President

Facilities Development

Edison Plasa

300 Madison Avenue

,

Toledo, Ohio 43652

J

Gentlemen:

This refers to the inspection conducted by Mr. R. Martin and

J. Barker of this office on December 13 and 28-30, 1976, of

activities at the Davis-Besse Unit 1 Construction site autho-

rized by NRC Construction Permit No. CPPR-80 and to the

discussion of our finalings with you at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspectica consisted of a selective arm =4 nation of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NBC requirements were identified

during the course of this inspection.

l

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2 Title 10, Code of Federal Regulations, a

!

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report cournina information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

j

application is coneminant in an enclosure to the application.

oWTJo4

k

}

s o o2 0 s or7p

6

O?e-191

_,.._ - - . __ ..-

-

-

-

l

._ _ ..

.

__ -

_.

_ _ _ .

-

=

.

.

. _ _ _ _ . _ . . ,

-__

_ _ _ _ . . - - . . - - . _

- _ - - - - - - - - - - - - -

-

--

.

.

.

Toledo Edison Conpany

-2-

JAN 111977

We will gladly discuss any questions you have concerning this

inspection.

Sincerely yours,

.

.

Gaston Fiore111, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures

1

IE Inspection Report

No. 050-346/76-24

cc w/ encl:

Central Files

\\ReproductionUnitNRC20b

PDE

!

Local PDE

NSIC

TIC

U. Young Park, Power

Siting Commaission

1

1

.

. .

__ _

__

_ . _

, - _ _ . _ _ , _ . _ _ _

_ . - _ _