ML19326A133

From kanterella
Jump to navigation Jump to search
Forwards Review of NRC Confirmatory Measurements Program for Use in Facility Performance Evaluation
ML19326A133
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/01/1976
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19326A134 List:
References
NUDOCS 8002030013
Download: ML19326A133 (2)


Text

. _ _

n V

UNITED STATES NUCLEAR REGULATORY COM?.11SSIO N

. CENTRAL FILES REGION lli 799 ROCSEVELT AC AG GLEN ELLYN. ILLINCIS 50107 5EP L W:

Toledo E ison Company Docket No. 50-346 ATTN!

Mr. Lowell E. Roe Vice President Facilities Development Edison Plaza 300 Madison Avenue Toledo, Ohio 43652 Gentlemen:

As you are avere, the NRC conducts a nationwide Confirmatory Measurements Program at nielaar power facilities. This program consists of tests of licensen measurements of radioactivity in actual or s4=n1=ced plant affluent samples, comparing the licensee's measurements to those of our URC reference laboratory.

The measurements made by the NRC reference laooratory are trace-able to the National Bureau of Standards' Radioactivity Measure-ments System by laboratory intercomparisons.

The NRC's Office of Inspection and Enforcement has been conducting the confirmatory maesurements program with nuclear power facilities since 1973. In the past, inspectors have discussed changes in the program with your staff during the course of their confirm-atory====arements inspections. In order to update your informa-tion and assist you in evaluating your facility's performance, we have prepared the enclosed review of our present Confirmatory Measurements Program.

4.#Cy y

,s

$ Ql- )

800203ool3 5v i

l g

.c ee p j

--oo

>>.e a

m 6EE i

g7',

Toledo Edison Cogany We consider acceptable results in this program to be of significant importance, and request your continued cooperation. We vill gladly discuse any questions concerning this matter.

Sincerely yours, James G. Kappler Regional Director

Enclosure:

Confirustory Measurements Program ec w/ enc 1:

Mr. J. Evans Station Superintendant bec w/ encl:

Central Files IE Files PDR Local PDR U. Young Park, Power Siting Comission