Jersey Central Power & Light Company 0
MADISQN AVENUE AT PUNCN SQW1. RQ AQ e MORRISrCWN. N.J. o796o e 339 611:
October 6,1972 Mr. A. Cia =busso Deputy Director for Reactor Projects Directora:e of Licensing United States A::=le Energy Cc==ission hshingte:., D. C. 20545 9 my w
3,,
v g] -l 5
Dear Mr. Cia =busso:
a 3
,ww o
Subject:
Cys:cr Creek S:ation Docket No. 50-219 Inoperable S:andby Liquid Centrol Syste:
'Ihe purpose of this letter is to rapor: to yo'u an inciden:
that occurred a: Oyster Creek en Sep:c=ber 26, 1972 in which 1: was discovered tha: :he two pe=ps in the s:andby liquid control syste=
were inoperable at the sa=e ti=c.
At 10:45 a.=.'on Sep:c=ber 25, 1972, the "A" standby liquid con:rci pu=p was rc=oved frc= service for replace =en: of the pu=p packing. The pu=p was taken ou: of service using Technical Specifica: ion 3.2.C.3 as :he basis.
It s:stes, "If one standby liquid centrol syste= pu= ping circuit becc=es in-operable during the run =cde and specifica:ica 3.2.A is =et,
.the reactor =ay re=ain in opera:ica for a period not :o exceev c,even days, provided the pu=p in the other circui: is dc=on-strated daily to be operable". Specifica:ica 3.2.A is =et, therefore, the "A" pu=p breaker was racked cut and the pu=p secured in accordance with plant safety procedures. The wars was not cc=ple:cd by :he end of the day shift, and the "A" pu=p was left in an inoperable condi:icn. At 4:20 a.=. cn Septe=ber 26, 1972', the "3" liquid con:rol syste= pu=p was to be run to ec= ply with Technical Specification 3.2.C.3.
When the operator depressed the start butten, the pu=p did not start.
An interlock in the starting circuitry prevents vo standby liquid control pu=ps frc= being run s1=ultaneously.
This interlock also preven:s the "3" pu=p frc= star:ing when the "A" pu=p breaker is in :he racked ou: positicn. The interlock is ce=pesed of a nor= ally closed contact in the starting circuit of each pu=p.
This contac: is opera:ed from a relay in the opposite pu=p circuit.
If the "A" standby liquid control pu=p is s:ar:ed either frc= the control roo= with the key lock switch or locally frc= the 8001310
(
t L,):
(
- g. A. Cia =ht.s-Page II O.ctober 6, 1972 L
.. I push button statica, a relay is picked c'p which opens the nor= ally closed con:act in the "3" standby liquid control pu=p starting circuit which preven:s this pu=p frc= opera:ing with the "A" pu=p running. The reverse is truc if :he "3" pu=p is started.
The proble= developed when the breaker for the "A" pu=p was racked out.
It disabled the pu=p and at the sa:e ti=c it physically re=oved the contact in :he s:arting circuitry for the "3" pu=p which si=ula:cd an open cen:ac:. This preven:ed the "B" pu=p from starting.
As soon as the Shif t Fore =an was aware of the inoperability of both pu=ps, he star:ed a nor=al shutdcun of the plan:.
In the meanti=e, he received per=1ssion to clear the =aintenance safety tags and rack the "A" pu=p breaker to its nor=al posi: ion. He then ran a successful operabili:y check on the "3" pup.p.
The load redue:1on was s:opped and the plan: re:urned to full load.
In order c' prevent a recurrence of this event, operating procedures have been changed so that operabili:y :es:s of redundan:
engineered safeguards syste: cc=penen:s vill be =ade i==edia:ely following any action :ha: requires one of the sys:c=s to be inoperable for =ain:enance purposes.
We are enclosing forty copics of this letter.
Very truly yours,
[$7 }. M'l E O IvanR.Finfrock,J;f p
Vice Presiden:
IRF/pk Enclosures cc: Mr. J. P. O.'Rei,lly, Director Directorate of Regula:ory Operations, Region 1
~-