NOTICE OF VIOLATION t t i
Southern California Edison. Company
' Docket No. 50-361 1
j f
50-362 a s c
n
'd['LicenseNo.NPF-10 San Onofre Units'2 and 3
?
- i 4
NPF-15 1
,7 t.
.~
During an NRC inspection conducted on July 30 through September 9,1989, two violations of NRC ' requirements were identified. 'In'accordance with the
~
" General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1989),' the violations are listed below:
i A.
Section 6.8,1 ofethe Unit 2 Technical Specifications requires written procedures;to be established and implemented for,"The applicable procedures' recommended in Appendix A of Regulatory Guide ?.33 Revision
- 2. February 1978." Appendix A of Regulatory Guide 1.33, Revision 2, includes in the listing of procedures which should be provided, "1.
Administrative Procedures... b.
Authorities and Responsibilities for Safe Operation and Shutdown."
7 Section 6.5.2 of Operating Division Procedure S0123-0-14, TCN 0-9 p
" Technical Specification LC0 Action Requirements (LC0AR) and Equipment Deficiency Mode Restraints (EDMR)," requires that upon discovery of inadvertent LC0 3.0.3 entry, immediate action to correct the problem shall be initiated..In addition, "If the condition is not corrected within 30 minutes of discovery or one hour after. initiation time (whichever. time is later), then initiate a plant shutdown.
Section 4.0.3 of the San Onofre Technical Specifications states, in part, that " Failure to perform a Surveillance Requirement within the specified time interval shall constitute a-failure to meet the OPERABILITY requirements for a Limiting Condition for Operation."
Section 3.3.2 of the Technical Specifications requires loss of voltage relays associated with the 4.16 vital buses to be operable in Mode 1.
i Section 4.3.2.1 of the Technical Specifications specifies channel L,
' calibration requirements for these relays.
I Contrary to the above, at approximately 1:00 p.m. on August 24, 1989, with the unit operating in Mode 1, the licensee determined that the channel calibration for the loss of voltage relays associated with the "A" Train 4.16 KV vital bus was required to have been performed on August j.
15, 1989. Since this channel was required to be operable pursuant to the e
limiting condition for operation under Technical Specification 3.3.2, E
Technical Specification 3.0.3 was entered. However, the required sur-i i
veillance test was not completed until 12:02 p.m. on August 25, 1989,
{
l and e Unit shutdown was not initiated as required.
This fs a Severity Level IV violation (Supplement I), applicable to Unit 2.
l l
1' 891.130129 891027 PDR ADOCK 05000206 G
PNV
o q
l g't l}
b 0' :
B.
Technical Specification 6.8.1 requires that applicable procedures recommended in Appendix A cf Regulatory Guide 1.33, Revision 2 February, i
1978 be established and implemented, t
Appendix A of Regulatory Guide 1.33, Section,9 " Procedure for Performing
' Maintenance,"' states that " Maintenance that can affect:the' performance of safety-related equipment should be properly' preplanned and, performed in accordance with written procedures, documented 1nstructions, or drawings appropriate to the circumstances."
l 2.
a,.
. to procedure S0123-I-1.7; " Maintenance' Order Preparation,i Use and Scheduling.(TCN 2-4)", states that:.
i
,s
" Work activities that require any obstruction,to pass through at A
Control Room Boundary Doorway must=be accurately described 1n the i
3 work documents as being a breach-of Control Room CREACUS (controle room emergency air cleanup system)(boundaries. The work
'4 organization must ensure that any obstructions tnrough:the boundary doors, such as hoses, cables, etc.*, will have a quick disconnec~t device in the near vicinity of the breached doorway. The~
Maintenance Order will specify that personnel will t,e prepared to remove the obstruction and close the door when notified.
For cases where a work organization has an obstruction through a Control Room Boundary doorway, it will have an individual continuous 1y' stationed at the door ready to react to directions from Security or Operations personnel to remove the obstruction and close the door as directed."
Contrary to above, on August 15, 1989, CREACUS door AC236 was tied open with five temporary power cables installed through the door opening.
These cables did not have quick disconnect devices installed and no one was stationed at the doorway.
'This is a Severity Level IV violation (Supplement I), applicable to Units 2 and 3.
Pursuant to the provisions of 10 CFR 2.201, Southern California Edison Company is hereby required to submit a written statement or explanation to the U.S.
Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555 with a copy to the Regional Administrator, Region V, and a copy to the NRC Senior Resident Inspector, San Onofre, within 30 days of the date of the
' letter transmitting this Notice. This reply shou'Id be clearly marked as a
" Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation if admitted, (2) the corrective steps that have been taken and the results achieved (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified i
I
E.
-D ',
i,
[
';g
{.
, i L
^ s.
inthisNotice,anordermaybeissuedtoshowc$usewhy'thelicenseshould t
s not be modified, suspended, or revoked or why such other' action as may be '^
proper.should not be taken.
Consideration.may be given to extending the; response time for good cause shown.'
3 FOR THE NUCLEAR' REGULATORY! COMMISSION
[
8I
)
[
A. E. Chaffee, Deputy Director Division of Reactor Safety and Projects
)
^
i Dated at Walnut Creek, California this R day.of October,1989 I