Forwards Insp Rept 50-213/89-17 on 891002-06.No Violations Noted.Areas for Improvement Identified During Insp Discussed W/Site Staff & Corrective Actions Implemented Immediately
ML19325E968
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/01/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19325E969 List:
References
NUDOCS 8911130124
Download: ML19325E968 (2)


See also: IR 05000213/1989017

Text

r

!; i

( 3 aj e e

'

v m

}

j

'

NOV 01 1989

,

i

,

Docket No.

50-213

i

,

Connecticut Yankee Atomic Power Company

ATTN: Mr. E. J. Mroczka

' Senior.Vice President - Nuclear

!

Engineering and Operations group

i

P. O. Box 270

Hartford, Connecticut 06141

,

Gentlemen:

Subject: Inspection Report No. 50-213/89-17

$

1989 by S'

A routine, unannounced inspection was conducted on October 2-6

SherbiniattheHaddamNec4 Station.Theaurposeoftheinspecfionwastoreview'

l

.

.

the radiological controls activities at tie site during the refueling outage,

- and also to review the status of the radiological controls program and

' implementation of short and long range ALARA measures.

,

i:

Within the scope of this ins)ection, no violations were identified. Most

activities observed during. tie inspection were performed in accordance with

good radiolo ical practices. An exception was some aspects of the activities

conr.ected wi h fuel reconstitution in the fuel storage building, but concerns

regarding this activity were immediately addressed by your staff. ALARA

functions connected with outage work were found to be good. There is, however,

'

concern regarding the termination of corporate assessment of the site

'

radiological controls program and activities.

^

Some areas for improvement identified during this inspection were discussed with

your site staff and corrective actions were being im lemented before the end of

+

L

this inspection. Details are provided in the attache inspection report.

L,

No reply to this letter is required. Your cooperation with us'is appreciated.

l

l

b'yn3 dined By:

l'

Rauld R. Bellamy

Ronald R. Bellamy, Chief

'

Facilities Radiological Safety

and Safeguards Branch

Division of Radiation Safety and

Safeguards

Enclosure: Inspection Report No. 50-213/89-17

i

\\

n &Mt WC'

'

- -

,

8911130124 891101

h'

r

,

PDR

ADOCM 05000213

0

.G:

pg

gy

_

_

_

__

.

-

.

7

)

.

...,

< . .,

.

l

t

'

NOV 01 1989

,

Connecticut Yankee Atomic Power Company 2

.

cc w/ encl:

W. D. Romberg, Vice President, Nuclear Operations (Receives Safeguards

Information)

D. B. Miller, Station Superintendent (Receives Safeguards Information)

D. O.'Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

S. E. Scace Station Superintendent, Millstone

GeraldGarfleid, Esquire

Public Document Room (Room) (LPDR)

PDR

,

local Public Document

Nuclear Safety Information Center (NSIC) ds Information)

NRC Resident Inspector (Receives Safeguar

State of Connecticut

'

bec w/ enc 1:

Region I Docket Room (with concurrences;

Management Assistant, DRMA (w/o encl)

DRP Section Chief

.

A. Wang- LPM, NRR

'T.Shediosky,RI, Millstone 1&2

SRI, Haddam Neck

W. Raymond, S

>

$[

0L

gy

,fre S. Sherbini

W. PascYak

R. Bellamy

11/01/89

11/01/89

11/01/89

-

.. .

.

m

.;g a.

l 6Y10 be

$

h

w