See also: IR 05000213/1989017
Text
r
!; i
( 3 aj e e
'
v m
}
j
'
NOV 01 1989
,
i
,
Docket No.
50-213
i
,
Connecticut Yankee Atomic Power Company
ATTN: Mr. E. J. Mroczka
' Senior.Vice President - Nuclear
!
Engineering and Operations group
i
P. O. Box 270
Hartford, Connecticut 06141
,
Gentlemen:
Subject: Inspection Report No. 50-213/89-17
$
1989 by S'
A routine, unannounced inspection was conducted on October 2-6
SherbiniattheHaddamNec4 Station.Theaurposeoftheinspecfionwastoreview'
l
.
.
the radiological controls activities at tie site during the refueling outage,
- and also to review the status of the radiological controls program and
' implementation of short and long range ALARA measures.
,
i:
Within the scope of this ins)ection, no violations were identified. Most
activities observed during. tie inspection were performed in accordance with
good radiolo ical practices. An exception was some aspects of the activities
- conr.ected wi h fuel reconstitution in the fuel storage building, but concerns
regarding this activity were immediately addressed by your staff. ALARA
functions connected with outage work were found to be good. There is, however,
'
concern regarding the termination of corporate assessment of the site
'
radiological controls program and activities.
^
Some areas for improvement identified during this inspection were discussed with
your site staff and corrective actions were being im lemented before the end of
+
L
this inspection. Details are provided in the attache inspection report.
L,
No reply to this letter is required. Your cooperation with us'is appreciated.
l
l
b'yn3 dined By:
l'
Rauld R. Bellamy
Ronald R. Bellamy, Chief
'
Facilities Radiological Safety
and Safeguards Branch
Division of Radiation Safety and
Safeguards
Enclosure: Inspection Report No. 50-213/89-17
i
\\
n &Mt WC'
'
- -
,
8911130124 891101
h'
r
,
ADOCM 05000213
0
.G:
pg
gy
_
_
_
__
.
-
.
7
)
.
...,
< . .,
.
l
t
'
NOV 01 1989
,
Connecticut Yankee Atomic Power Company 2
.
cc w/ encl:
W. D. Romberg, Vice President, Nuclear Operations (Receives Safeguards
Information)
D. B. Miller, Station Superintendent (Receives Safeguards Information)
D. O.'Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
S. E. Scace Station Superintendent, Millstone
GeraldGarfleid, Esquire
Public Document Room (Room) (LPDR)
,
local Public Document
Nuclear Safety Information Center (NSIC) ds Information)
NRC Resident Inspector (Receives Safeguar
State of Connecticut
'
bec w/ enc 1:
Region I Docket Room (with concurrences;
Management Assistant, DRMA (w/o encl)
DRP Section Chief
.
A. Wang- LPM, NRR
'T.Shediosky,RI, Millstone 1&2
SRI, Haddam Neck
W. Raymond, S
>
$[
0L
gy
,fre S. Sherbini
W. PascYak
R. Bellamy
11/01/89
11/01/89
11/01/89
-
.. .
.
m
.;g a.
l 6Y10 be
$
h
w