Submits Response to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Util Currently Working W/Bwr Owners Group to Develop GDC That Will Address Issue.Anticipates Design Criteria Availability by 900430 for NRC Review
ML19325E789
Person / Time
Site: Hope Creek 
Issue date: 10/30/1989
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-16, NLR-N89220, NUDOCS 8911080461
Download: ML19325E789 (3)


Text

n, # -

. [ 's.

e; I

$1 i

i Pubhc Service Electric and Gas Company -

Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-4800 Vee Prwoent. Ec4 ear Operaho e October 30, 1989 NLR-N89220 i

United States Nuclear Regulatory Commission Document' Control Desk Washington,'DC 20555 L

Gentlemen:

RESPONSE TO GENERIC LETTER 89-16 INSTALIATION OF HARDENED WETWELL VENT FACILITY OPERATING LICENSE'NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 On September 1, 1989, the NRC issued Generic Letter 89-16 to r

inform the owners of BWR plants with Mark I containments of the NRC program for disposition of issues related to the Mark I Containment Performance Improvement Program.

This letter encouraged utilities to. voluntarily install a hardened vent under the provisions of 10 CFR 50.59.

Our review of SECY 89-017 indicates that the primary benefit of the' hardened vent:is the reduction of risk associated with the TW (loss of decay heat removal) sequence.

The Hope Creek Generating Station (HCGS) has an existing six inch hardened vent, the use of which is currently controlled by Emergency Operating Procedures.

This vent is of sufficient size to reduce containment pressure and suppression pool temperature to provide adequate venting capability for the.TW sequence.

Public Service Electric and Gas Company (PSE&G) will be working with the BWR Owners' Group to develop generic design criteria that address the hardened vent issue.

It is anticipated that th9 design criteria will be available for NRC review by April 30, 1990.

HCGS-specific design details will be reviewed against the generic criteria established and any upgrades to the existing six inch vent design will be developed as PSE&G completes the appropriate portions of the Individual Plant Examination (IPE) for HCGS and studies the possibility of system interaction effects between the proposed upgrades to the vent and existing plant design.

h DO

[

J

1 Document Control Desk 10-30-89 NLR-N89220 Based upon NRC acceptance of the generic criteria within 6 months of submittal by the BWR Owners' Group, any upgrades to our existing six inch hardened vent will be completed prior to restart following the second refueling outage from the date of this letter or January 1, 1993, which ever is later.

It 4 3 the belief cf PSE&G that the risk of the TW sequence is already low.

Upgrading the existing hardened vent will further reduce the risk of this sequence and make a significant contribution to closing the NRC's Mark I Containment Performance Improvement Program.

Sincerely, f1j - ffW C

Mr.

C.

Y. Shiraki Licensing Project Manager Mr.

D.

K. Allsopp Resident Inspector Mr. W.

T. Russell, Administrator Region I Mr. Kent Tosch, Chief Bureau of Nuclear Engineering New Jersey Department of Environmental Protection

'_<, K *, +, e

~-

F

'Ref:

NLR-N89220 STATE OF NEW JERSEY

)

)_

SS.

COUNTY OF SALEM

)

S.

La Bruna, being duly sworn according to law deposes and says:

I am Vice President - Nuclear Operations of Public Service Electric and Gas Company, and as such, I find the matters set i

forth in our letter dated October 30, 1989

, concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.

f.rw Subscribed and Sworn to b o e me this 3d day of 1989 ktary Publb of New Jersey LARAINE Y. BEARD Notary public of New Jern My Commission expire, gay 3, {ppl My Commission expires on i