ML19325E714
| ML19325E714 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 10/31/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML19325E715 | List: |
| References | |
| NUDOCS 8911080314 | |
| Download: ML19325E714 (3) | |
See also: IR 05000482/1989020
Text
,,
.
_
_ _ _ _ _ .
,'s
-
.
.
[.
a
..
.
L
' 0CT 3 1 1989
In Reply Refer.To:
,,
Docket:
STS 50-482/89-20
i
'
Wolf Creek Nuclear Operating Corporation
ATTN: Bart D. Withers
President and Chief Executive Officer
F
P.O. Box 411
O
Burlington,_ Kansas 66839
[
Gentlemen:
l
This refers to the special team inspection conducted by Mesbrs. H. Chaney,
B. Nicholas, C. Hooker, and M. Skow, during the period August 28 - Septmber 1,
[.
1989, of activities authorized by NRC Operating License NPF-42 for Wolf Creek
Generating Station, and to the discussion of our findings with Mr. J. Bailey
and other members of your staff et the conclusion of the inspection on
September 1, 1989.
Areas examined during the inspection involved your radiological control program
including:
radiation protection, radioactive effluent releases, low-level
,
radioactive waste, and radioactive materials transportation programs. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspectors.
The inspection findings are documented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
,
t
We have also examined actions you have taken with regard to previously
l
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
An unresolved item is identified in paragraph 5 of the enclosed inspection
report.
l
Should you have any questions concerning this inspection, we will be ples. sed to
discuss them with you.
,
!
Sincerely,
!
b$lectT40:
James L. Milhoan, Director
.,
Division of Reactor Projects
"
o
Enclosu
'(e n t page)
!
.
RV k
C:FRPS
RIV:
RI
- DRS
D:0RP
l
HDC
olas
'
Skow
CHooker
B
rray
Bea
JM11hoan
l
D
9 /*/ /89
y/89l 0/p/89
p/89 (10/ t/89
f
- H /89
'
pmma%
A
l
'
0
.,
,
.s
Wolf Creek Nuclear Operating
-2-
Corporation
Enclosures:
l
1.
Appendix - NRC Inspection Report
.
'
'~
50-482/89-20
2,
Attachment 1 - Documents Reviewed
.
,
3.
Attachment 2 - Lice.isee Personnel Contacted
l
4.
Attachment 3 - Radiation Exposure Summaries
j
cc w/ enclosures:
l
Wolf Creek Nuclear Operating Corp.
ATTN: Gary Boyer, Plant Manager
P.O. Box 411
Burlington, Kansas 66839
Shaw, Pittman, Potts & Trowbridge
,
ATTN: Jay Silberg, Esq.
,
1800 M Street, NW
.
Washington, D.C.
20036
j
Public Service Commission
-
ATTN:
Chris R. Rogers, P.E.
Manager, Electric Department
l
P.O. Box 360
Jefferson City, Missouri 65102
<
v
U.S. Nuclear Regulatory Commission
ATTN:
Regional Administrator, Region III
799 Roosevelt Road
i
Glen Ellyn Illinois 60137
!
U.S. Nuclear Regulatory Commission
i
ATTN:
Regional Administrator, Region IV
i
611 Ryan Plaza Drive, Suite 1000
i
Arlington, Texas 76011
,
U.S. Nuclear Regulatory Commission
l
ATTN:
Senior Resident Inspector
,
P.O. Box 311
'
Buritngton, Kansas 66839
!
Wolf Creek Nuclear Operating Corp.
[
ATTN: Otto Maynard, Manager
Regulatory Services
P.O. Box 411
Burlington, Kansas 66839
l
Kansas Corporttion Commission
l
ATTN:
Robert Elliot, Chief Engineer
Utilities Division
4th Floor - State Office Building
Topeka, Kansas 66612-1571
i
f
-+
e
t
.
,
!
$1
N
.
,
!
[
Wolf Creek Nuclear Operating
.3 -
'
'
,
Corporation
)
Office of the Governor
State of Kansas
Topeka, Kansas 66612
Attorney General
.
1st Floor - The Statehouse
}
Topeka, Kansas 66612
i
Chairman, Coffey County Commission
i
Coffey County Courthouse
Burlington, Kansas 66839
Kansas Department of Health
and Environment
Bureau of Air Quality & Radiation
Control
-
ATTN: Gerald Allen, Public
i
Health Physicist
Division of Environment
Forbes Field Building 321
Topeka, Kansas 66620
'
'
bec to DMB (IE06)
bec distrib. by RIV:
,
- RRI
- R. D. Martin, RA
- $ection Chief (DRP/D)
'DRP
'
- RPB-DRSS
R. DeFayette, RIII
'
'RIV File
SRI, Callaway RIII
I
- MIS System
- RSTS Operator
- Project Engineer (DRP/D)
Lisa Shea, RM/ALF
r
- DRS
- D
V.' Pickett, NRR Project Manager (MS:
13-D-18)
- w/766
i
f
I
,
6-
4
!
i
h
l
,
i
.
D