ML19325E058

From kanterella
Jump to navigation Jump to search
Concurs W/Request to Replace Four Instrument Racks During Second Refueling Outage.Concurrence Based on Compensatory Measures Taken & Fact That No LERs Re Operation of Racks Issued Since 1987
ML19325E058
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/23/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
References
NUDOCS 8911010108
Download: ML19325E058 (1)


Text

.'

,8 y >D Os,q,

Unit t.) ST11t s g

g k

NUCLEAR. REGULATORY COMMISslON

[

' fi (,

8 ft(GlON til i

f I

TD9 ROObt.vt LT RO AD k..... ' n OCT 2 31989 Ott N (LLYN, ILLINOll 60137

}

L l

i I

Docket No. 50-341 The Detroit Edison Company ATTN:

B. Ralph Sylvia Senior.Vice President.

I Nuclear Operations 6400 North Dixie Highway t

Newport, MI 48166 I

Gentlemen:

This refers to our meeting on September 1,1989, and your subsecuent letter l

dated September 15, 1989, requesting NRC concurrence with your ceferral of the

[

replacement of 4 instrument racks until the second refueling outage. Based on l

the compensatory measures you have taken, and the fact that since 1987 no LERs have been issued due to the operation of these racks, we concur wIth your request.

If you-have any questions regarding this matter, please contact M. Ring of l

nty staff.

Sincerely, j

vh

=+ &

Edward G. Greenman, Director i

Division of Reactor Projects cc:

Patricia Anthony, Licensing l

P. A. Marquardt, Corporate I

3 Licensing Fee Hanagement Branch Resident Inspector, RIII

. Ronald Callen, Michigan Public Service Commission Harry H. Voight, Esq.

Michigan Department of Public Health Monroe County Office of

%g Civil Preparedness i

891101010889102]1 DR ADOCK 0500 a

7g.

.