Revised Monthly Operating Rept for Sept 1989 for Hope Creek Generating Station,Unit 1
ML19325D781
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/30/1989
From: Jensen H
Public Service Enterprise Group
To:
Shared Package
ML19325D775 List:
References
NUDOCS 8910260134
Download: ML19325D781 (1)


Text

  • ~ ~

Q}f f y

yj.g{y?

k -

'" CD 4

. OPERATING DATA REPORT.

" !"; ' .J'"

~

DOCKET NO.._50-354 UNIT > Hope Creek D DATE'10/16/89 COMPLETED'BY' _H. 'Jensen '

,, t .

-TELEPHONE (609) 339-5261

.CPERATING' STATUS' L1'. LREPORTING PERIOD September 1989_ GROSS HOURS IN REPORTING PERIOD 720 .

Up

~ ' ' '

2. ; CURRENTLY AUTHORIZED' POWER' LEVEL-(HWt) 3293 1 MAX' DEPEND. CAPACITY, (MWe-Net).

. 1031

s. DESIGN ELECTRICAL RATING-(MWe-Net) 1067 '

MAX,~ DEPEND. CAPACITY ~(MWE-GROSS) 1076 13 . iPOWER LEVEL TO WHICH RESTRICTED (IF ANY) . (MWe-Net) None t

4.< REASONS:FOR RESTRICTION-(IF ANY)

  • . THIS- YR.TO-MONTH DATE CUMULATIVE

, y. :5.-

NO'.iOF HOURSLREACTOR WAS CRITICAL _ 356.9 5739.0 20,686.6

/

6.- REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 Y7. HOURS GENERATOR ON LINE 345.1 5,721.9 20,354.0 J 8.. UNIT. RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 9.> GROSS THERMAL ENERGY GENERATED (MWH)t 800,240- 17,736,164 63,739,878

10. GROSS: ELECTRICAL ENERGY

. GENERATED (MWH) 263,450_ 5,840,079 _21,066,525 11'1. .- ' NET ELECTRICAL' ENERGY GENERATED (MWH) - 244,303 _5,576,898 20,126,918 6 12.- REACTOR ~' SERVICE FACTOR 49.6 87.6 84.8 c 13 ." REACTOR AVAILABILITY FACTOR 49.6 87.6 84.8 "14. ; UNIT SERVICE FACTOR 47.9 87.3 83.5__

15 . UNIT AVAILABILITY FACTOR 47.9 87.3 83.5 f16. ' UNIT CAPACITY FACTOR i

'(Using MDC) 32.9 82.6 80.1 .

i 17.. UNIT CAPACITY FACTOR  !

(Using Design HWe) 31.8 79.8 77.4 l

18 '. UNIT FORCED OUTAGE RATE 4.5 1. 2._ 5.7 E19 . SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION):

NONE

20. . IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

11/10/89  :