.9[.6 x Jctober 4, 1989
.l l. g of Docket No.150-312:
e e-g'NRC'8"lPDRs" "MT
-E. Jordan
- w T. Meek (4)
PD5 Reading:
Wanda Jones 4
- Mr! Dan R. Keuter MVirgilio J..Calvo
. Assistant General Manager, Nuclear-
'JLee ACRS(10)L Rancho ~ Seco Generating Station GKalman' GPA/PA s14440 Twin Cities Road' SReynolds OC/LFMB-Herald.:CaliforniaL 95638-9799 OGC
-Region _V.(4):
D. Hagan-DLaBarge
Dear Mr. Keuter:
SUBJECT:
RANCHO SECO NUCLEAR GENERATING STATION -GENERIC LETTER 83-28, r[
lTEM2.2(PART1),EQUIPMENTCLASSIFICATION(PROGRAMFORALL'
- ~
SAFETYRELATEDSOMPONENTS)(TACNO.53709)
Generic Letter 83-28; Item 2.2.1 required ~the'Sacremento Municipal Utility l
.-District (SMUD) to describe in considerable = detail-the program for. classifying.
- all safety-related components other_ than RTS components as safety-related on -
-]
documents and in information handling systems that are used to control plant
- activities.that'may affect these components. SM_UD responded to the above in.
asubmittals dated November 4. 1983, May 23, 1985, and. December 3, 1986.- The.
'l staff has evaluated these responses-and find'these responses acceptable.. Our-Safety Evaluation-(SE)_and the Technical Evaluation Report (TER)'by our q
contractor, EG&E Idaho,-Inc., are enclosed for your information. This' completes-Item'2.2.1 of Generic Letter 83-28 for.the Rancho.Seco Nuclear. Generating
' Station.
~
Sincerely, q
original signed by Steven 'Reynolds H
Steven A. Reynolds, Project Manager Project Directorate V--
Division-of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor. Regulation
Enclosures:
y
. As stated gu
.cc w/ enclosures:
.See next page-j 1
,l
-[RS TAC 53709]
1
]
)
'SReynol
- r' GKalmarf y
on i
- /0
/89 lo / t./89 ~
Io /1 /89 jg / /89
$h Y
t 0FFICIAL' RECORD-COPY
,'{
l i
[.
l
.. 89'10100351 891004 L
.A'PDR :ADOCK 05000312 Q
PJmt - ~ -..=-
h f',
l l
pg M X a
a e hc#..e*>9,j E
- UNITED STATES =
- l c.
$ r-
~ NUCLEAR REGULATORY COMMISSION I
m 18,f l
- wasmwatow. o. c. aoses k
- ((.
October 4. 1989-l
+
e
,,e.
[D'ocketNo.?50-312 L
Mr. Dan R. Keuter.
a 1
E 5 Assistant General Manager; Nuclear Rancho Seco Generating Station' l
Je 14440 Twin Cities Road
' Herald,' California' 95638-9799 m
Dear Mr.:
' KeuterL.
SU8 JECT: RANCHO SECO NUCLEAR GENERATING STATION - GENERIC LETTER 83-28, J
ITEM 2.2(PART1),EQUIPMENTCLASSIFICATION(PROGRAMFORALL i
SAFETY..RELATEDCOMP0NENTS)(TACNO.53709)-
l 5
Generic Letter 83-28, Item 2.2.1 required the Sacramento: Municipal: Utility.
k
- District (SMUD) to describe'in considerable detail the program for classifying;
' all: safety-related components other than RTS components as safety-related on -
. documents and -in:information handling systems'that ~are used to control plant-activities that say affect these components. SMUD responded to the.above.in
-submittals dated November 4, 1983, May 23. 1985, and December 3, 1986. The-Lstaff.has evaluated these responses and find these responses acceptable. Our u
JSafety Evaluation:(SE) and-the Technical Evaluation Report-(TER) by our-contractor EG&E -Idaho, Inc., are enclosed for your information. This completes D
JItem 2.2.1' of. Generic Letter 83-28 for the Rancho Seco Nuclear Generating -
t P
Station.2 p4 t'
Sincerely,-
q.
Steven A. Reynolds, Project Manager Project Directorate V-Division of Reactor Projects - III, y
f, IV, Y and.Special Projects!
M Office of Nuclear Reactor Regulation
Enclosures:
~ As; stated ~
c Lcc w/ enclosures:
See:next page y
il I
l
e
. -. ~.. - -
ano.
~
-w s
- h ':
-o 1
3
.Mr. Dan Keuter Rancho Seco huclear Generating Station CC.
Ms. Jan Schori, General Manager Mr. John Bartus
-Sacramento Municipal Utility District Ms. JoAnne Scott 6201 S Street Federal Energy Regulatory Comission P.O. Box'15830 825 North Capitol Street, N. E.
Sacramento, California 95813 Washington, D.C.
20425 Thomas A. Baxter, Esq.
Ms. Helen Hubbard Shaw, Pittman, Potts & Trowbridge P. O. Box 63 2300 N Street, N.W.
Sunol, California 94586 Washington, D.C.
20037 Environmental Conservation hr.' Steven Crunk Organization Manager,: Nuclear Licensing Suite 320 Sacramento Municipal Utility District 101 First Street Rancho Seco Nuclear Generating Station Los Altos, California 94022 14440 Twin Cities Road Herald, California 95638-9799 Mr. Robert B. Borsum, Licensing Representative o
Babcock & Wilcox i -
Nuclear Power Division
- 1700 Rockville Pike -Suite 525 L
Rockville, Maryland - 20852 Resident inspector / Rancho Seco c/o U. S. N. R. C.
14440 Twin Cities Road L
' Herald, California 95638 Regional Administrator, Region V l
U.S. Nuclear Regulatory Connission 1450 Maria: Lane, Suite 210 Walnut Creek, California 94596 L
Mr. John'Hickman
. Senior Health Physicist Environmental Radioactive Management Unit Environmental Management Branch State Department of Health Services 714 P Street, Room 616 1