ML19325C941

From kanterella
Jump to navigation Jump to search
Grants Partial Exemption from 10CFR171 Annual Fees,Per 890922 Application.Document Showing Refund Calulation Encl
ML19325C941
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/05/1989
From: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Campbell G
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 8910180182
Download: ML19325C941 (3)


Text

oC Mk'

,4 October 5, 1989

/

Docket No. 50 313 Arkansas Power & Light Company L

ATTN: Mr. Gene Campbell, Vice President Nuclear Operations P.O. Box 551 Little Rock, AR 72203 i

Gentlemen:

By application dated September 22, 1989, you requested a partial exemption from L

the FY 1989 annual fees of 10 CFR 171 for the Arkansas 1 reactor. You requested.

that a portion of fees already paid be refunded because you had been charged L

for research which had not been performed.

As you are aware, Part 171 user fees are assessed on the basis of budgeted costs, not actual obligations.

Since it is expected that there will be some deviations between the funds budgeted for a specific activity and those actually obligated, exemptions will rarely be granted.

However, in unusual situations where there is a very significant variation between the budgeted obligations and the actual obligations, an exemption may be considered.

We have completed our review of the exem) tion request filed by your attorneys.

Based on the fact that very significant )udgeted costs for two B&W research-related activities, namely, " Prevent Reactor Core Damage - Plant Performance -

B&W Testing" and " Reactor Accident Risk Analysis. Assessment of Plant Risks,"

were not totally obligated for these specific activities in FY 1989, but rather were expended for other activities relating to all power reactors, we have determined that a partial exemption is appropriate. Therefore, pursuant to the-provisions of 10 CFR 171.11, a partial exemption is hereby granted for the Arkansas 1 reactor. The annual fee is reduced from the FY 1989 rate of 51,592,000 to $1,320,000; accordingly, an appropriate refund will be sent to you shortly. Enclosed is a document showing how the refund has been calcu-lated.

If there are questions regarding this exemption, please contact Mr. Lee Hiller, Deputy Controller, on 301 492 7351.

Sincerely.

Original Signed By:

James M. Taylor James M. Taylor Acting Executive Director for Operations-

Enclosure:

Refund Calculation See attached for distribution.

d w two chbi,,

I/

1 OC DO 10FC OC s

RMS gins :

J NAME :CJH way:js p:

L j/y

-DATE : 10/

/89 : 10/5' /89 : 10

/89

10/ 3 /89 : 10 6 /89 89101dvidz 091005 gDR ADOCK0500g{3 0FFICIAL RECORD COPY

p-,

u s,;,ll y

y DISTRIBUTION' JMTaylor, Acting EDO EDO R/F-License Fee Debt Collection 171 Fee File Docket File OC Part 171 Exemption File t

CJHolloway,OC(2)

LHiller, OC

- RMScroggins, OC OC R/F,

GDJohnson OC/DAF:

EKBlack,OC/DAF DBDandois, OC/LFDCB

~

JDWeiss '0C/LFDCB TRothschild,;OGC R$mith, OGC fQIL. -

o 9

1 f

F s

b 9

  • e

[k'

,(**"

n COMPUTATION OF PROPOSED ADJUSTED ANNUAL

]

FLE TO BE A55E5 btu FOR EIGHT BABCOCK AND WILCOX~(B&W) REACTOR 5 FY 1989 BUDGET Part 171 Work by Research PTS FTE

'i

. Original Budget Base Nuclear Steam Supply Sy(B&W only) stem -

Large Dry Containment 1.

Prevent Reactor Core Damage -

$3,500,000 1.8 Plant Performance - B&W Testing

'2.

Reactor Accident' Risk Analysis -

475,000

.7 Assessment of Plant Risk l

Subtotal

$3,975,000 2.5 2.5 FTE x $150,900/FTE =

377,000

+

Total Costs

$4,352,000 = $544,000 per reactor-Total B&W keactors 8

RevisedBudgetBase(SumsObligated) 1.

Prevent Reactor Core Damage -

$1,309,000 1.6 P! ant Performance - B&W Testing-2.

Reactor Accident Risk Analysis -. Assessment of Plant Risks Subtotal

$1,309,000 1.6 1.6 FTE x $150,900/FTE =

241,000 t,

Subtotal Revised Costs

$1,550,000 Recap

$4,352,000 Original Costs 1.550,000 Revised Costs

$2.802.000 Costs Applicable to All Plants 106 Reactors

$26,400 x 8 B&W Reactors

211,000 P

Total B&W Revised Costs

$1,761.000 = $220,000 per reactor Total B&W Reactors 8

$5'44,000 - $220,000 = $324,000 x.84(M Factor) = $272,000 Amount of Each Refund ENCLOSURE 1

._