ML19325C799

From kanterella
Jump to navigation Jump to search
Forwards Site Specific Response Spectra Oyster Creek Nuclear Generating Station
ML19325C799
Person / Time
Site: Oyster Creek
Issue date: 10/11/1989
From: Croneberger D
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325C800 List:
References
5000-89-1828, NUDOCS 8910170285
Download: ML19325C799 (1)


Text

'

I 4f.'[

t

.o-p n ;i -

k GPU Nueleet Co#poration N

mr.

One Upper Pond Road Parstppany, New Jersey 07054 '

201 316 7000 TELEX 136-482 Writers Direct Dial Numbet 7

October 11, 1989-S000-89-1828

'U.S.'. Nuclear Regulatory Commission

Attentions 1 Document Control Desk Mail-_tation P1-137 S

Washington, D.C.

20555-

~

Gentlement

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Free Field Site Specific Response Spectra

-On July'7, 1987, during a meeting with the NRC staff, GPUN presented a need for

-unification of. Oyster Creek seismic floor response spectra (FRS) and proposed a

methodology that would utilize the Site Specific Response Spectra (SSRS) developed by the NRC staff during the Systematic. Evaluation Program (SEP) with

'an appropriate reduction for soil structure interaction (SSI).

subsequently,-by' letter dated Dec. 21, 1987, the NRC staff recommended two options ;GPUN could, pursue.;;One option required the development of a new free-field SSRS for Oyster Creek.

on May 25, 1988, GPUN presented a methodology for the new SSRS.

During the meeting.the staff: raised several concerns as documented in.their letter dated

~

June 22, 1988.: Their concerns were related to-(1) records which included the

~

^

SSI' effects (2)' suitability of shear velocity to judge the compatibility with the Oyster Creek site (3) absence of recent earthquake records which could be suitable for analysis and (4) inclusion of P-wave velocity.

-Y

.The attached report includes newly developed SSRS and methodology utilized. A summary of the newly developed SSRS was presented to the staff in our recent meeting on September 27, 1989. The report also justifies the new SSRS and

.provides our responses to the above staff concerns.

l Ver ru your,

V l#l reneberger AObl Acting Director DKC/cjg s

8910170283 891011 s

PDR ADOCK 05000219 p

PDC

.C320326 GPU Nuclear Corporation is a subsidiary of General Public Utilities Corporation