| Issue date: | 10/03/1989 |
| From: | Fiedler P GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| C311-89-2113, NUDOCS 8910160313 | |
| Download: ML19325C491 (2) | |
Text
,
w j', [ w : _,n,.
J-G l
e
- a
,?: m fl?. y Q @f ' '
?
u
" fi
[i:
4' ll (t
+
. GPU Nuclear Corporation --
One Upper Pc>nd Road, Sr -
Parsippany, New Jersey 07054' 201 316 7000
+
TELEX'136 482
'i f
Writer's Direct Dial Number:
\\
y l,}
c
.o October-3, 1989 C311-89-2113 j
- ,./
r U.S. Nuclear. Regulatory Commission l
/ Document Control' Desk
' Washington, DCL20555 y
m 5+
Subject:
Oyster Creek Nuclear Generating Station Docket No. 50-219 and Three Mile Island Nuclear Generating Station Docket No. 50-289 Licensed operator. Qualification. Requirements 1
?:
on September'28, 1989, a telephone conference call was conducted between
.GPU Nuclear and the U.S. Nuclear Regulatory Commission. During the course of that discussion, GPU Nuclear made several verbal commitments relative to
- qualification requirements for an initial application for o reactor operator license under 10CFR55..This letter is being written to docket these verbal commitments.
The GPU' Nuclear Operational Quality Assurance Plan in Appendix C, Part 1, commits to implementing. Regulatory Guide 1.8 Revision 1-R, as modified in.
4 Appendix C Part 2.
GPU Nuclear committed to revising the Part 2 requirement to include 6' months of operating experience as a prerequisite for a. initial reactor operator application until the applicable station simulator has been
.c certified in accordance with 10 CFR 55.45.(b).
This change will be reflected
.in the annual submittal of the Operational Quality Assurance Plan which de'cribes changes made under 10CFR50.54(a)(3).
It is understood by GPU Nuclear tho.NRC approval of that change would not be required because it directly
- incorporates:an accepted NRC position.
Additionally,.both the_ Oyster Creek and Three ".ile Island Nuclear Generating Stations' Initial License Operator Training Programs will be revised to include this same six month requirement as a prerequisite for entering the
. licensed operator program until the applicable station simulator has been certified in accordance with 10 CFR 55.45.(b).
l l
/ "8910160313 891003e b003 l
-PDR: ADOCK 05000219
)
+
V PDR v-I \\
l GPU Nuclear Corporation is a subs: diary of General Public Utilities Corporation
- .
- 3 er-1.-
C b
1*
$7
- bi n
-c
.+
IS+s
- 4:
3;:0. [
U.S. Nuclear Regulatory.comm'ission s<
3 foetoberL3,s1989:
[7 -
s
.Page 2 i
If any additional information is required, please contact;Mr.; Michael Heller at l(609)-971-4680.
,Y
'Very.truly yours,
,,)h_ _ _b_
iedler
+
Vice President and Director c,+
~6 Quality and Training-s
- EEF/MCII/dmd w:,
. ?
~
- cc: Mr. William T. Russell, Administrator US Nuclear Regulatory Commission Region I
)
, 475 Allendale Road l
-King of Prussia, PA 19406 Mr. Alex W. Dromerick, Project Manager
' US Nuclear Regulatory Commission x
- Washington, DC 20555' Mr.-Robert Gallo-Chief, Operations Branch Division ~of Reactor Safety
. RegionI US' Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA. 19406 Mr.' R.-Hernan, Project Manager.
US Nuclear Regulatory Commission Washington, DC 20555 r
Mr. Kenneth E.
Perkins
(..
Chief, Operator Licensing Branch Division of Licensee Performance & Quality Evaluation Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission
-Washington, DC 20555 i:
NRC Resident Inspectors l
Oyster Creek Nuclear Generating Station NRC Resident Inspectors Three Mile Island Nuclear Goneating Station i
Mr. J. F. Stolz, Division of
. Reactor Project Director L
US Nuclear Regulatory Commission
.L
. Washington, DC 20555 w.
.,er-,
m
,-w e
,e v.
v.
- -- -, - - -n
+-