g mi-Gevo a Poe Cornp:q
.e
- 333 P+dwnt Annae Atenta Ocoig 2 30308 letephona (04 5?6 3195 Mailing Address 40 inemen Conte Parkway Post Ottee hon 1Pis5 Bnmen3han Atatxena 35201 bierhone 205 868 5501 ec saat%<ncharg syMem W. G. Heirston, til Sensor Vee President Nacmar Opwations HL-815 0385V U.S. Nuclear Regulatory Commission ATTN: Document Cor, trol Desk' Washington, D.C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 MONTHLY OPERATING REPORTS i
. Gentlemen:
Enclosed are the Monthly Operating Reports for Plant Hatch Unit 1 m
Docket' Number 50-321.- and for Plant Hatch Unit 2. Docket Number 50-366.
These reports are submitted in accordance with the requirements of Technical Specifications' Section 6.9.1.10.
Sincerely, O,
/
l n
H. G. Hairston, III Ci.T/eb
Enclosures:
1.
Monthly Operating Report for Hatch-1
- i
- 2.. Monthly Operating Report for Hatch-2
- c
(See next page.)
.e h
t l
8911160182 891031 pi PDR ADOCK 05000321
.R PDC 3
V,
,1-
s.
.~
e e
4
. (3eorgia Potter Jr Q.
U.S. Nuclear Regulatory Commission i
Page Two c: Georgia Power CQEDADY Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch GO-NORMS U.S. Nuclear Regulatory Commission. Washinaton. D.C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Regulatory _ Commission. Region II
{
Mr. S. D. Ebneter, Regional Administrator i
Mr. J. E. Menning, Senior Resident Inspector - Hatch i
i i
5 1
s l
1 I
J l1 l
l I
l 0385V
'l o
L
I a
c e'
ENCLOSURE 1 TABLE OF CONTENTS PLANT HATCH - UNIT 1 NRC DOCKET 50-321 MONTHLY OPERATING REPORT October. 1989 NARRATIVE REPORT Page El-1 OPERATING DATA REPORT Page El-2 AVERACE DAILY POWER LEVEL Page El-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page El-4 l
f l,
0385V l
l l
J
J' NARRATIVE REPORT DOCKET NO. 50 321 UNIT 1 DATE: NOVEMBER 2, 1989 COMPLETED BY:
R. M. BEARD TELEPHONE:
(912) 367 7781 x2878 I
OCTOBER 1 0000 Maintaining rated thermal power.
OCTOBER 7 2100 Reducing load to approximately 550 GMWe to perform a Rod BypassValvetestIng,rbineControlValveandTurbine Sequence Exchange Tu i
i OCTOBER 8 0800 Returning to rated thermal power.
OCTOBER 31 2400 Maintaining rated thermal power, i
I 6
P t
I s
l l'
El-1 l
r 4
i OPERATING DATA REPORT DOCKET NO. 50 321 f
DATE: NOVEMBER 2, 1989 t
COMPLETED BY:
R. M. BEARD TELEPHONE:
(912) 367 7781 x2878 OPERATING STATUS 10 UNIT NAME:
E. 1. HATCH UNIT 1
- 2. REPORT PERIOD:
OCTOBER, 1989 i
MWt :
2436 l
). LICENSED THERMAL POWER (MWe :
- 4. NAMEPLATE RATING (GROSS 850 i
- 5. DESIGN ELECTRICAL RATING fN T MWe):
776.3 i
- 6. MAXIMUM DEPENOABLE CAPACI1Y (GROSS MWe 789.6
- 8. If CHANGES OCCUR IN CAPACITY (NET MWe):)
i
- 7. MAXIMUM DEPENDABLE CAPACITY 756.6 RATINGS i
(ITEMS 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
NO CHANGES f
- 9. POWER LEVEL TO WHICH RESTRICTED, If ANY (NET MWe):
NO RESTRICTIONS,
- 10. REASONS FOR RESTRICTION, If ANY:
N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
745 7296 121271 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
745.0 7296.0 88143.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 i
- 14. HOURS GENERATOR ON LINE:
745.0 7296.0 83872.1
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 f
i
- 16. GROSS THERMAL ENERGY GENERATED MWH):
1804328 17364165 183844851 i
- 17. GROSS ELEC. ENERGY GENERATED (M H):
584970 5607470 59321400
- 18. NET ELEC. ENERGY GENERATED (MWH :
560088 5365042 56391675
- 19. UNIT SERVICE FACTOR:
100.0%
100.0%
69.2%
- 20. UNIT AVAILABILITY FACTOR:
100.0%
100.0%
69.2%
i
- 21. UNIT CAPACITY FACTOR USING HDC NET):
99.4%
97.2%
62.0%
- 22. UNIT CAPACITY FACTOR USING DER NET):
96.8%
94.7%
59.5%
i
- 23. UNIT FORCED OUTAGE RA E:
0.0%
0.0%
14.1%
i
- 24. SHUTDOWNS SCHEDULED OVER~ THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)-
Refueling Outage: Tentatively Scheduled for February 28 25..IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUh:1990;119 Days N/A 26.. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION):
N/A i
l' l
L El-2 l
0
o*,
l i
UNIT 1 DOCKET NO. 50 321 AVERAGE DAILY DATE: NOVEMBER 2, 1989 POWER LEVEL COMPLETED BY:
R. M. BEARD OCTOBER, 1989 TELEPHONE:
(912) 367 7781 x2878 DAY NET MWe k
1.........
744 2.........
748 3.........
749 i
4.........
751 i
5...s 749 6.........
750 7.........
724 8.........
658 9.........
762 10.........
760 11.........
755 12.........
755 13.........
756 14.........
754 15.........
751 16.........
748 17.........
751 18.........
751 19.........
757 20.........
765 21.........
765 22.........
763 23.........
763 24.........
764 f
25.........
762 26.........
762 27.........
759 28.........
760 29.........
792 30.........
756 31.........
754 i
l e
l l
El-3 l
l l
l i
m o
\\
i I
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-321 DATE: NOVEMBER 2, 1989 UNIT NAME:
E.I. HATCH 1 COMPLETED BY:
R. M. BEARD TELEPHONE:
(912) 367 7781 x2878 REPORT MONTH - OCTOBER, 1989 R
M 5
E E
Y T
A T
LICENSEE SC Y
S H
EVENT T0 COMPONENT CAUSE & CORRECTIVE P
DURATION O
O REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N 0
NUMBER HE (SUBCODE)
PREVENT RECURRENCE No significant power reductions this month.
[
5 i
F: FORCEO REASON:
METHOD:
EVENTS REPORTED INVOLVE 1 - MANUAL A GREATER THAN 20%
A EQUIPMENT FAILURE (EXPLAIN) 2 - MANUAL SCRAM S: SCHEDULED B-MAINTENANCE OR TEST REDUCTION IN AVERAGE C REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D REGULATORY RESTRICTION 4
CONTINVATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 LOAD REDUCTION l
F-ADMINISTRATIVE 9 - OTHER (EXPLAIN) l G.0PERATIONAL ERROR (EXPLAIN)
H 0THER (EXPLAIN) o El-4
e
- o j ',
,,a
+
s >, ;,
I s-g-
ENCLOSURE 2 TABLE OF CONTENTS L
PLANT HATCH - UNIT 2' lc
'NRC DOCKET 50-366 MONTHLY OPERATING REPORT' r..
QttQher,1919 p
e NARRATIVE REPORT Page E2-1
. y.
OPERATING DATA REPORT Page E2-2 l-AVERAGE DAILY POWER LEVEL Page E2-3 UNIT SHUTDONNS'AND POWER REDUCTIONS Page E2-4 y.
e
\\
r I k.
r 6
.' w
.a-
.\\
l
.t r, -
.o
-)
t i
f f
, i.,
\\.
t l
L o
0385V i
j
p$
NARRATIVE REPORT DOCKET NO. 50 366 UNIT 2 DATE: NOVEMBER 2, 1989 en COMPLETED BY:
R. M. BEARD i
TELEPHONE:
(912) 367 7781 x2878 t
OCTOBER 1 0000 The Eighth Refueling Outage is in progress.
OCTOBER 22 1015 Began core reload.
l t
DCTOBER 30 1935 Core reload complete.
}
OC10BER 31 2400-The Eighth Refueling Outage is in progress.
f i
[
1 F
i i
i f
I l
I r
t e
E2-1 i
t 4
i
[
OPERATING DATA REPORT DOCKET NO. 50-366 DATE: NOVEMBER 2, 1989 COMPLETED BY:
R. M. BEARD TELEPHONE:
(912) 367-7781 x2878 OPERATING STATUS
- 1. UNIT NAME:
E. 1. HATCH UNIT 2 I
- 2. REPORTING PERIOD:
OCTOBER, 1989 j
- 3. LICENSED THERMAL POWER 2436
- 4. NAMEPLATE RATING (GROSS (MWt :
MWe :
850 l'
S. DESIGN ELECTRICAL RATING (N T MWe):
784 L
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
800.7 i
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
767.7
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE PIASONS:
NO CHANGES
- 9. POWER LEVEL TO Wii!CH RESTRICTED, IF ANY (NET MWe):
NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY:
N/A THIS MONTH YR-TO DATE CUMULATIVE 6
- 11. HOURS IN REPORTING PERIOD:
745 7295 88897
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL:
0.0 5902 64803.9 i
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0
0.0
- 14. HOURS GENERATOR ON LINE:
0.0 5902 62257.7
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0
0.0
- 16. GROSS THERMAL ENERGY GENERATED MWH):
0 12883197 134920622
- 17. GROSS ELEC. ENERGY GENERATED (M H):
0 4199380 44292370
- 18. NET ELEC. ENERGY GENERATED (MWH :
3706 3991171 42148356 i
- 19. UNIT SERVICE FACTOR:
0.0%
80.9%
70.0%
L
- 20. UNIT AVAILABILITY FACTOR:
0.0%
80.9%
70.0%
- 21. UNIT CAPACITY FACTOR USING MDC NET):
0.0%
71.3%
62.0%
l
- 22. UNIT CAPACITY FACTOR USING DER NET):
0.0%
69.8%
60.5%
- 23. UNIT FORCED OUTAGE RA E:
0.0%
0.1%
8.5%
i
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE DATE, AND DURATION OF EACH): N/A 25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATEDDATEOFSTARTUP:
December 20 1989 r
l 16.UNITSINTESTSTATUS(PRIORTOCOMMERCIALOPERATION):
N/A 5
1 l
P l
l E2-2 l
y
'e s
t f
UNIT 2 DOCKET NO. 50 366 AVERAGE DAILY DATE:
NOVEMBER 2, 1989 POWER LEVEL COMPLETED BY:
R. M. BEARD i
OCTOBER, 1989 TELEPHONE:
(912) 367-7781 x2878 i-DAY NET MWe e
1.........
O r
2.........
O 3.........
0 1
4.........
O t
5.........
O 6.........
O t
7.........
0 8.........
O i
9.........
O 10.........
O 11.........
0 r
12.........
O 13.........
O i
14.........
0 15.........
0 16.........
0 1
17.........
0 18.........
0 19.........
0
-r 20.........
0 21.........
O 22.........
0 1
23.........
O 24.........
0 l
25.........
O 26.........
0 27.........
0 28.........
0 l
29.........
0 30.........
0 31.........
O j
f l
1 6
l l
l l
l r
E2-3 1
l
I i
UNIT SHUTDOWNS AND POWt2 REDUCTIONS DOCKET NO. 50 366 DATE:
NOVEMBER 2, 1989 UNIT NAME:
E.1. HATCH 2 COMPLETED BY:
R. M. BEARD TELEPHONE:
(912) 367-7781 x2878 l
REPORT MONTH OCTOBER, 1989 R
M 5
E E
Y T
A T
LICENSEE SC Y
S H
EVENT T0 COMPONENT CAUSE & CORRECTIVE P
DURATION 0
0 REPORT ED CODE ACTION TO NO.
DATE E
(HOURS)
N D
NUMBER HE (SUBCODE)
PREVENT RECVRRENCE 89 007' 890904 S
745.00 C
4 N/A RC FUELXX Refueling Outage in progress.
s g
i
[
i F: FORCED REASON:
METHOD:
EVENTS REPORTED INVOLVE 1 - MANUAL A GREATER THAN 20%
A EQUIPMENT FAILVRE (EXPLAIN) 2 - MANUAL S'; RAM REDUCTION IN AVERAGE S: SCHEDULED B MAINTENANCE OR TEST C-REFUELING 3
AUTO. SCRAM DAILY POWER LEVEL FOR e
D REGULATORY RESTRICTION 4 - CONTINVATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)
G-0PERATIONAL ERROR (EXPLAIN)
H 0THER (EXPLAIN)
E2 4 l
.-.